Precio FOB
Obtener el precio más reciente1 USD /
|- Minimum Order
País:
China
N º de Modelo:
Non-standard
Precio FOB:
1 USD / Obtener el precio más reciente
Lugar de origen:
-
Precio de pedido mínimo:
1
Cantidad de pedido mínimo:
-
Detalle de embalaje:
According to the client's requirement or feature of equipment , using multi-packing method to pa
El tiempo de entrega:
3 Months
Capacidad de suministro:
12 Set per Year
Tipo de pago:
L/C, T/T
Grupo de productos :
Persona de contacto Tony
Jiaoshe village No.1113, Dongguan, Guangdong
Packaging Details: | According to the client's requirement or feature of equipment ,using multi-packing method to pack the equipment, such as wrap devices with stretch film to protect the coating of surface ,or pack the small parts with cardboard boxes ,heavy parts with wooden case |
---|---|
Delivery Detail: | 3 Months |
The Ceramic Paint Spraying Production Line have been used in many industry, and the Ceramic Coatinghave many excellent advantages. The main application and the advantages used in cookware industry :
Because the metal cannot be used directly for cookware ,the attached coating is very important, the Ceramic Coating get more and more praise for its excellent nature and healthy environmental protection. Especially its stickness is more stronger than Teflon when manufacturing nonstick pan, and not easy to peel off, it isnon-toxic and harmless ,and not easy to decompose for a long time in the high temperature environment.
The product with Ceramic Paintas follow:
Product Description
The whole Ceramic Paint Spraying Production Linecan be customized according to clients requirement ,such as the size range of your work piece, production capacity you want , technological process you required ,and the layout design to meet your work shop.
Main equipments included in Ceramic Paint Spraying Production Line as follows( can be selectable and adjustable):
Equipment Name |
Function and Description |
Desktop Pretreatment With Drying Oven
|
Automatic degreasing ,water- washing ,air blowing ,drying and cooling ,it's usually used for dedusting and derusting before sandblasting. The process of acid washing ,alkali washing ,neutralizing and water washingcan be designed according to clients requirement or the feature of work piece. |
SandblastingMachine |
We have a variety of type for client to choose, automation, semi-automation ,manual type and the production output can be customized according to client's requirement. The machine equip with dust collecting device , and sand recycle device. |
Automatic Dedusting Room |
Using for dedusting before the process of spraying primer |
Preheating Oven |
Adopt the form of
far infrared radiation heating to
preheat the work piece before spraying primer, the
temperature is usual about *0℃**0
℃ |
Double-layer water-curtain room ( Spray Room) |
Used for coating spraying, adopt imported famous brand spray guns, water- curtain is used for absorbing and cleaning the atomized paint to avoid polluting the environment and harming the health of workman. |
Drying oven and high temperature curing furnace |
The drying oven is used for drying primer coating , and the high temperature curing furnace is used forcuring the mid-coating and top-coating . |
Supporting system |
Central Control System , exhaust piping and drain piping system , waste water treatment system and environmentally friendly waste gas treatment system. |
The below Production Flow is only for reference , the specific need according to actual requirements!
1.Pre-treatment before sandblasting
Loading > Degreasing > Wash > Acid Wash / Alkali
Wash > Neutralizing > Wash > Blow water >
Drying >
Cooling
> Unloading ( for sandblasting)
2.Sandblasting
Loading > Sandblasting > Unloading the work piece to
coating conveyer belt
3. Inner Coating Process
Loading> Auto dust removal > Preheat> Primer Spray > Spray Top-coat > Transfer Workpiece >
Low Temperatur Volatilize> High Temperature Sintering > Sharp freezing > Unloading
4. Outer Coating Process (Optional)
Loading > Spray outer coat > Turn to high temperature furnace > high temperature sintering > Sharp freezing
> Unloading
1. Design: We have a professional Engineering Design Team to design scheme to meet your requirements , such as therang of workpiece size, capacity of production , and other especial requirement
2. Manufacturing:
We have an excellent
manufacture team to produce the products of superior
quality , which be made
using best
material.
3.Installation and
Debugging: We can sent
engineer on site to charge of Installation and
debugging
4.After-service Promise:
We promise to provide 1 year
warranty of
maintenance
1. What is the quotation process of our company
We need to know your requirement as follow (point 2),then we will arrange budget.
2.Which the requirement or parameter we should know?
We hope to get the first information you provide as follow:
1) Thenameof work piece
2) The sizeof standard work piece
3) Themax.
sizeand weight of work
piece
4)
The materialof work
piece
5) Thecapacity
(output) of coating line you
require
6)
Theheating
resource (electricity ,diesel, LPG ,nature
gas?)
7)
What is the voltageand
frequency you
provide?
8) Have any special requirement of process flow
.
9) Whichkind of paint do you use?
Does it have any special drying temperature and
time requirement?
*0) It is better to provide
theworkshop building
layout drawing, we can arrange the layout of
coating line accordingly.
*1)The direction oflogistics flow
*2) The direction of drainage and exhaust and treatment location of waste water and gas.
3.
How much time to finish the Ceramic Paint Spraying Production
Line?
It takes almost **3 months to finish the Ceramic Paint Spraying Production Line after we both agree on scheme and sign the contract.
4. How
to use it?
We'll provide onsite
installation and training service till your
workers can fully operate it for production
purpose.
País: | China |
N º de Modelo: | Non-standard |
Precio FOB: | 1 / Obtener el precio más reciente |
Lugar de origen: | - |
Precio de pedido mínimo: | 1 |
Cantidad de pedido mínimo: | - |
Detalle de embalaje: | According to the client's requirement or feature of equipment , using multi-packing method to pa |
El tiempo de entrega: | 3 Months |
Capacidad de suministro: | 12 Set per Year |
Tipo de pago: | L/C, T/T |
Grupo de productos : | Non-stick Coating Production Line |