Precio FOB
Obtener el precio más reciente( Negotiable )
|16 Ton Minimum Order
País:
China
N º de Modelo:
JXHM504-2
Precio FOB:
( Negotiable )Obtener el precio más reciente
Lugar de origen:
-
Precio de pedido mínimo:
-
Cantidad de pedido mínimo:
16 Ton
Detalle de embalaje:
20L iron pail
El tiempo de entrega:
20 to 30 days
Capacidad de suministro:
16 Ton per Month
Tipo de pago:
T/T
Grupo de productos :
Persona de contacto Ms. Becky
fengxiang, Foshan, Guangdong
**4 *2 lamination
Adhesive (Metal/PVC or PET) Application It is suitable for lamination between metal and other matericals such as PVC sheet,PET sheet and so on.
Technical
performance
Process condition of ****2 1.Metal plate should be washed by acid or alkali, and then clean it with water. Finally dry it. 2.This product can be coated on the metal plate or the film (except PVC film). Note: the adhesive must be coated on the metal plate only when compounding metal plate with PVC film. 3.Ratio for reference:main agent: diluent: curing agent(solid content: (*5%±2))=*0:5~8:1~2.5. 4.Diluent is the mixture of Ethyl acetate and cyclohexanone (ratio:1:1) ,when the metal plate combines with PVC film.Or else,you can use ethyl acetate or butyl acetate as diluent only. 5.The amount of coated adhesive:coating amount(dry basis) can be chosen from 4.0g /m2 to *0.0g/m2, depending on the smoothness of composite. When PVC films laminate with metal,you should choose *0 g/m2. 6.Temperature of Drying Tunnel:first stage:*0℃~*0℃; second stage:*0℃ ~*0℃; third stage:*0℃~*0℃ 7.Temperature of pressing roll:*0°C~**0°C can be chosen,if the deformation condition of films is unaffected. 8.Not Suitable for compound PVC in high temperature, so you can choose normal temperature or *0°C below. 9.Dry the PET-Metal composite(no solvent left). *0.According to customer demand for products, we can make the overall design of the program, including modifying the product formulation and setting the process methods. |
País: | China |
N º de Modelo: | JXHM504-2 |
Precio FOB: | ( Negotiable ) Obtener el precio más reciente |
Lugar de origen: | - |
Precio de pedido mínimo: | - |
Cantidad de pedido mínimo: | 16 Ton |
Detalle de embalaje: | 20L iron pail |
El tiempo de entrega: | 20 to 30 days |
Capacidad de suministro: | 16 Ton per Month |
Tipo de pago: | T/T |
Grupo de productos : | adhesive |