Precio FOB
Obtener el precio más reciente35 ~ 40 USD / Piece ( Negotiable )
|100 Piece Minimum Order
País:
China
N º de Modelo:
YAOHANG
Precio FOB:
35 ~ 40 USD / Piece ( Negotiable )Obtener el precio más reciente
Lugar de origen:
China
Precio de pedido mínimo:
35 per Piece
Cantidad de pedido mínimo:
100 Piece
Detalle de embalaje:
Standard wooden and pallet packing
El tiempo de entrega:
15-20working days
Capacidad de suministro:
10000 Piece per Month
Tipo de pago:
T/T, L/C, D/A, D/P, Western Union, Money Gram, PayPal
Grupo de productos :
-
China
Persona de contacto Ellie Yang
Zhengzhou, Henan
The Application Of Hollow Plastic Formwork
Plastic Construction Formwork can be used in Construction Engineering, Bridge Tunnel Engineering, Water Conservancy and Hydropower Engineering, Mine Dykes and Underground Engineering, Pipeline Turnover, etc.
1.High-rise Building and
Construction Engineering
The building formwork is a kind of temporary structure, which is
made according to the design requirements, so that the concrete
structure and components are shaped according to the prescribed
position and geometrical dimensions, maintain their correct
positions, and bear the weight of the building formwork and the
loads acting on it. The purpose of carrying out the formwork
project is to ensure the quality of concrete works and
construction safety, speed up construction progress and reduce
project costs.
2.Bridge Tunnel Engineering
&Water Conservancy and Hydropower Engineering
Plastic Construction Formwork has light weight, high strength,
good hardness, impact resistance, and wear resistance properties,
the surface is flat and smooth; the pouring molding effect is
good. As it is no water absorption, no deformation, and no
mildew, after long-term soaking in water, it is not layered, no
foaming, and the sheet size is stable. It is especially suitable
for water conservancy projects.
3.Mine Dykes and
Underground Engineering, Pipeline Turnover
The toughness of a plastic building template is very good and it
can be made into a variety of special templates for curved
surfaces. The plastic construction template is resistant to acid,
alkali and corrosion; it is very suitable for applications in
coastal areas, underground engineering, mines, and seawall dams.
No need to do any antiseptic treatment for use and storage, do
not pollute the concrete surface.
1. The top plate of the plastic
building template is used to lay *5mm thick. The vertical die of
the shear wall can be *5mm based on the thickness and height of
the wall.
2.the distance between the woods:
â‘ roof plastic formwork support: Woods spacing is
determined according to the thickness of floor concrete. In
general construction conditions, the woods spacing (center
distance) is less than 0.*5m thickness, which is **0mm to
**0mm.
â‘¡Supporting shear wall plastic templates: Woods spacing is
adjusted by the all wall's height and thickness. For example, the
wall height is ***0mm and the wall thickness is **0mm, when the
*5mm thickness template is used, the vertical sub rib spacing is
**0mm, and the shear wall and pillar width is more than 1 meters,
the fixed frame must be added.
3. There is no gap between the shear wall and the column mould, and the part of the Yin angle (the bottom of the wall) must have a wooden side, which is convenient for the connection of the beam, the wall and the formwork. The shear wall formwork must be assembled into a whole after lifting, and then place a flat board , so to reduce labor intensity, and a good forming.
4. The edge of the plastic template
is *5 ~ *0mm from the edge of the template. The strength of the
nail is moderate and the length of the nail is generally *0 ~
*0mm, so it should not be too long or too short.
5. the wooden side of the floor of
the beam must be left out of 1.5 centimeters, and the wall is
standing on the mouth of the wooden square, so that it will not
leak out the pulp and save the wall material.
1.Cost Down.
New type of building template can re-use more than *5 times, the
average cost is less than US$0.3.
2. Saving energy and Protecting environment.
There's no harmful gas completely in the new type of building
template.
3. Smooth surface.
New type concrete template has smooth surface, because of this
the demould effect is better than fresh water formwork, no need
to plasterer twice.
4. Very well stability.
The new concrete template has excellent property of
cold-resistant, hot-resistant, aging-resistant no deformation,
low expansion coefficient.
5.High performance in the construction.
New type of building template has high strength, tenacity, no
breaking, no layering.
6.Porting and simple operated.
The new concrete template is very light, easy to install. For
example it is 6 kg/m2, only 1/2 weight of wooden template, reduce
the worker's time and effort effectively.
7. Can transpose at high price.
The template scrapped can also transpose to a new one, only need
to pay for the process.
8.Convenient storage.
The new type building template can withstand the corrosion of
acid, alkali, and the damage by worms, so the storage has no
specific demand for the environment.
9. Simple and convenient
demoulding.
No need to brush the release agent, demould easily.
*0. High changeability.
The new concrete template can be incised, cut and drilled
arbitrarily.
FAQ
Q1: Are you trading company or
manufacturer?
A: We are manufacturer.
Q2: How long is your delivery time?
A: Generally it takes **7 days if we have stock.
Otherwise it takes about **7 days depending on the quantity.
Q3: How soon can I get the quotation?
A: If your information is complete, we offer our quotation within
2 hours.
Q4: Could you supply solutions to us?
A: Sure we can.We have a professional team to solve your
questions.
Q5: Do you have a minimum order requirement?
A: Small trial order is acceptable.
Q6. How many workers in the factory?
A: We have more than **0 workers.
Q7. What's the annual capacity?
A: Our capacity is ***0,**0 square meter for a year
Q8. What's the standard of the material quality?
A: Our material can pass 6P,PAHs,EN*1.
Q9. The rubber sheet size design and logo can be
customerized?
A: Yes, just send us the design you prefer or you can also choose
from our selection.
Q*0. Can I have a sample for quality check?
A: Yes, we can provide 1pc sample for free, AND the express cost
will be the buyer stand.
And kindly you are invited to use the TRADE ASSURANCE.
Q*1. What is the production time ?
A: Normally it is **7 days,depending on how many orders before
you.
Q*2. What is the payment term?
A: Our payment term are T/T and L/C at sight.
Q*3. How do you gurantee the quality?
A: We have our own inspection team, if the defective rate is
above 2%,we will take the responsibility for any quality problems
caused by our side.
Q*4. Can you help me ship the goods to our port once ready?
A: Yes,we also have our own shipping agency, we can offer this
service at a competitive price.
Contact Us
If you are interested in our
products,please contact with me!
*;*@******************** Whatsapp:**6 **********6
Wechat:blue*********1
Mobile:**6 **********8
País: | China |
N º de Modelo: | YAOHANG |
Precio FOB: | 35 ~ 40 / Piece ( Negotiable ) Obtener el precio más reciente |
Lugar de origen: | China |
Precio de pedido mínimo: | 35 per Piece |
Cantidad de pedido mínimo: | 100 Piece |
Detalle de embalaje: | Standard wooden and pallet packing |
El tiempo de entrega: | 15-20working days |
Capacidad de suministro: | 10000 Piece per Month |
Tipo de pago: | T/T, L/C, D/A, D/P, Western Union, Money Gram, PayPal |
Grupo de productos : | - |