¿Aún no es miembro de TradeKey.com? Regístrese para conectarse con 9 millones de importadores y exportadores a nivel mundial. registro |
BOOK A CALL
Book Call On Your Favorite Time
Code
🗘

By Signing Up. I agree to TradeKey.com Terms of Use, Privacy Policy, IPR and receive emails related to our services

Contact Us
product
Prev
T-Beam girder moulds steel bridge formwork Box Girder for railway highway construction
Next

T-Beam girder moulds steel bridge formwork Box Girder for railway highway construction

( Negotiable )

|

20 Ton Minimum Order

País:

China

N º de Modelo:

08

Precio FOB:

( Negotiable ) Obtener el precio más reciente

Lugar de origen:

-

Precio de pedido mínimo:

-

Cantidad de pedido mínimo:

20 Ton

Detalle de embalaje:

standard export packaging

El tiempo de entrega:

30-60days after placed order

Capacidad de suministro:

5000 Ton per Month

Tipo de pago:

L/C, T/T

Grupo de productos :

-

Contactar ahora
Miembro Básico

Persona de contacto Jack

139# Fenghuang 6Rd, Jinan, Shandong

Contactar ahora

Especificaciones del producto

  • material:Q235 or Q345
  • Color:according to customers' requirment

Descripción del producto

Introduction

We collectively called "T-type girder bridge" it's like that the bearing structure of beam bridge is combined by the Top flange of reinforced concrete with girder rib, So we are named that "T-Beam" because the section shape of main girder is similarity of the Capital letters "T", The T-Beam was divided in "Highway T-girder" and "Railway T-girder" , According to the form can be divided into "Simple supported T-beam" and "Continuous T-beam"

Basic Construction

The T-Beam were precast at the beam fabricating yard, Which composed by High and low side of the formwork, soffit formwork and end formwork. With compared to rectangular beam , It can be save the concrete and reduce the structural weight and also Improve the spanning capacity.

The Processes of T-Beam Formwork used by Integrated Paving and  assembly welding method. Make sure that close piecing and without height difference ensure that its overall size for the formworks. The diaphragm plate formworks of T-Beams which should set the ejection gradient according to the principle of "big top and small bottom" and "small inside and big outside"

País: China
N º de Modelo: 08
Precio FOB: ( Negotiable ) Obtener el precio más reciente
Lugar de origen: -
Precio de pedido mínimo: -
Cantidad de pedido mínimo: 20 Ton
Detalle de embalaje: standard export packaging
El tiempo de entrega: 30-60days after placed order
Capacidad de suministro: 5000 Ton per Month
Tipo de pago: L/C, T/T
Grupo de productos : -

Send a direct inquiry to this supplier

A:

Jack < Shandong Boyuan Heavy Industries Co., Ltd >

quiero saber: