¿Aún no es miembro de TradeKey.com? Regístrese para conectarse con 9 millones de importadores y exportadores a nivel mundial.
registro |
BOOK A CALL
Book Call On Your Favorite Time

By Signing Up. I agree to TradeKey.com Terms of Use, Privacy Policy, IPR and receive emails related to our services

Contact Us
product
Prev
precast segmental box girder  mouldsfor Prestressed Concrete Box Girder Construction
Next

precast segmental box girder mouldsfor Prestressed Concrete Box Girder Construction

( Negotiable )

|

20 Ton Minimum Order

País:

China

N º de Modelo:

05

Precio FOB:

( Negotiable ) Obtener el precio más reciente

Lugar de origen:

-

Precio de pedido mínimo:

-

Cantidad de pedido mínimo:

20 Ton

Detalle de embalaje:

standard export packaging

El tiempo de entrega:

30-60days after placed order

Capacidad de suministro:

5000 Ton per Month

Tipo de pago:

L/C, T/T

Grupo de productos :

-

Contactar ahora
Miembro Básico

Persona de contacto Jack

139# Fenghuang 6Rd, Jinan, Shandong

Contactar ahora

Especificaciones del producto

  • material:Q235 or Q345
  • Color:according to customers' requirment

Descripción del producto

Professional precast formwork with ISO certificate

Box girder formwork segmental is necessary to build support and pour concrete at the construction site and traffic can be opened during the construction, which greatly reduces pressure on the traffic by the construction; module construction accelerates the onsite construction rates, which are more than a double for the traditional construction methods. This method increases science & technology content and technical level in urban viaduct project construction and massive use can reduce project cost.





Specifications

1 Materal: Q**5/Q**5

2 which reduces influences on surrounding residents and environment

3 Large lifting equipment is not requested

Box girder formwork segmental is necessary to build support and pour concrete at the construction site and traffic can be opened during the construction, which greatly reduces pressure on the traffic by the construction; module construction accelerates the onsite construction rates, which are more than a double for the traditional construction methods. This method increases science & technology content and technical level in urban viaduct project construction and massive use can reduce project cost.

País: China
N º de Modelo: 05
Precio FOB: ( Negotiable ) Obtener el precio más reciente
Lugar de origen: -
Precio de pedido mínimo: -
Cantidad de pedido mínimo: 20 Ton
Detalle de embalaje: standard export packaging
El tiempo de entrega: 30-60days after placed order
Capacidad de suministro: 5000 Ton per Month
Tipo de pago: L/C, T/T
Grupo de productos : -

Send a direct inquiry to this supplier

A:

Jack < Shandong Boyuan Heavy Industries Co., Ltd >

quiero saber: