Precio FOB
Obtener el precio más reciente|
50 Piece Minimum Order
País:
China
N º de Modelo:
-
Precio FOB:
Lugar de origen:
-
Precio de pedido mínimo:
-
Cantidad de pedido mínimo:
50 Piece
Detalle de embalaje:
Neutral package or according to clients' requirments.
El tiempo de entrega:
20-30 days
Capacidad de suministro:
10000 Piece per Month
Tipo de pago:
Western Union, T/T
Grupo de productos :
Persona de contacto Ms. INNA
Dongyi Industry Zone, Fengqiao Town, Zhuji City, Zhejiang Province, China, Shaoxing, Zhejiang
1.NO.:T***0(KAMAZ), T***4(KAMAZ), T***4DD,
T***4DD, T***0DD, T***0DD, T***4DP, T***4DP, T***0DP,
T***0DD(Sealed), T***0DD(Sealed)
2.Features:
·Working pressure: **0kPa
·Maximum working pressure: 1MPa.
·Pushrod stroke: 0 - *0mm
·Ambient temperature: - *0 **0
·Life-time: service chamber: 1, **0, **0 times
·Leading Standard: SAE J**6 **5
NO. | OEM NO. | Stroke | Port Thread | Bolt Thread | Bolt Centre | Push Rod Thread | Whole Push Rod Length |
T*0/*0DD | **5 **2 **2 0 | *4/*4 | M*6×1.5 | M*6×1.5 | **0.7 | M*6×1.5 | **5MM |
T*0/*0DD | **5 **2 **2 0 | *4/*4 | 3/8NPT | M*6×1.5 | **0.7 | M*6×1.5 | **5MM |
T*0/*0DD | **5 **2 **2 0 | *4/*4 | 3/8NPT | 5/8UNC | **0.7 | 5/8UNC | **5MM |
T*0/*0DP | **5 **2 **6 0 | *7/*7 | M*6×1.5 | M*6×1.5 | **0.7 | M*6×1.5 | **0MM |
T*0/*0DP | **5 **2 **6 0 | *7/*7 | M*2×1.5 | M*6×1.5 | **0.7 | M*6×1.5 | **0MM |
T*0/*0DP |
**5 **2 **1 0(L) **5 **2 **1 0(L) |
*4/*4 | M*6×1.5 | M*6×1.5 | **0.7 | M*6×1.5 | **0MM |
T***0DD(Sealed) | *4/*4 | M*6×1.5 | M*6×1.5 | **0.7 | M*6×1.5 | **5MM | |
T***0DD(Sealed) | *4/*4 | 3/8NPT | M*6×1.5 | **0.7 | M*6×1.5 | **5MM | |
T***0DD(Sealed) | *4/*4 | 3/8NPT | M*6×1.5 | **0.7 | M*6×1.5 | **5MM | |
T***0DP(Disc Brake) | *4/*4 | M*6×1.5 | M*6×1.5 | **0.7 | Φ*6 | **5MM | |
T***0DP(Disc Brake) | *4/*4 | M*2×1.5 | M*6×1.5 | **0.7 | Φ*6 | **5MM |
País: | China |
N º de Modelo: | - |
Precio FOB: | Obtener el precio más reciente |
Lugar de origen: | - |
Precio de pedido mínimo: | - |
Cantidad de pedido mínimo: | 50 Piece |
Detalle de embalaje: | Neutral package or according to clients' requirments. |
El tiempo de entrega: | 20-30 days |
Capacidad de suministro: | 10000 Piece per Month |
Tipo de pago: | Western Union, T/T |
Grupo de productos : | brake chamber |