¿Aún no es miembro de TradeKey.com? Regístrese para conectarse con 9 millones de importadores y exportadores a nivel mundial.
registro |
BOOK A CALL
Book Call On Your Favorite Time

By Signing Up. I agree to TradeKey.com Terms of Use, Privacy Policy, IPR and receive emails related to our services

Contact Us
product
Prev
Shingle tan
Next

Shingle tan

( Negotiable )

|

1000 Kilogram Minimum Order

País:

South Korea

N º de Modelo:

-

Precio FOB:

( Negotiable ) Obtener el precio más reciente

Lugar de origen:

-

Precio de pedido mínimo:

-

Cantidad de pedido mínimo:

1000 Kilogram

Detalle de embalaje:

standard export packing

El tiempo de entrega:

20days with contract

Capacidad de suministro:

100 Ton per Month

Tipo de pago:

T/T, L/C

Grupo de productos :

-

Contactar ahora

EZEN Global

South Korea

Miembro Básico

Persona de contacto Mr. hyoung sik

123,dongil-ro seong dong-gu, Seoul, seoul

Contactar ahora

Especificaciones del producto

  • Brand Name: Shingle tan

Descripción del producto

Shingletan
- Shingle waterproofing
Shingle Tan is a kind of one-component polymer water soluble urethane of the eco-friendly product and shows excellent adhesion and forming the elastic coating film provided with elegant color, flexibility and firming strongly after drying. Shingle Tan has a excellent weather resistance, water resistance and breathability so that it is suitable for waterproofing shingle sites where elasticity is required.
Features
● Eco- friendly aqueous elastic coating film waterproofing agent
● Excellent flowability and workability
● Excellent Contractility and expansion
● Prevent moisture penetration cracks
● Easy-to-use one-component type
● Water-soluble and non-toxic and odorless
Application
● Shingle areas
● Apartment, House of Commons alone utility room
● Where construction and maintenance is required
● The roof of the building
● Inorganic top coat

Construction Method
● In order to maximize the performance of product enforce the surface treatment before the construction as follows
● Shingle joints or lifting parts must be repaired with sealing products
Surface Treatment
① Coated floor must be sufficiently cured (*0 ℃ standards, curing more than *0 days)
â‘¡ Ground laitance, dust, oil and other contaminants are completely removed (pH7 ~ 9, the water content *0%)
â‘¢ Fill up the gaps or hole with repair putty. Seal the severe cracks and expansion joints after V-cutting and coat surface after adjustment
â‘£ Corner facing the wall and the bottom part and lifting part of the maintenance work.
⑤ Other parts of the construction side, using masking tape to protect
Construction / primer work
â‘  After treatment based primer and brush, roller or spray applied once
â‘¡ Enough paint to be absorbed when applied to the substrate surface
â‘¢ The coating should be applied uniformly to prevent not to be thicker coating partially.
â‘£ Primer paint for more than 2 days or rainy day with moderate to enhance the adhesion between layers of primer and then a thin
Sand Parpineg (0.2kg / ㎡) for additional application
Construction / moderate work
â‘  Use a brush, a roller after confirming the complete drying of the primer hard and apply in one direction
â‘¡ First do not thicken the coating during construction, and 3 times that split shingle work, can maximize the effect of the shingle tan
â‘¢ Check the status of the application surface with a dry place, ensure that there are  noproblems occur, the pinhole, then carried out the second application. Applied to the primary and secondary coating work in the direction of displacement
Construction and maintenance
● Refer to the complete drying time to control the pass and walk to protect the coated surface.
● Ventilate the indoor well when working with dry
● To immature work due to fault area is cut suitable area to be repaired and conduct construction method above
Notes
● Please be sure to use undiluted.
● Be sure to keep the temperature more than 5 ℃.
● If adhere to your skin, wash thoroughly with soap and water
● Please keep out of reach of children

País: South Korea
N º de Modelo: -
Precio FOB: ( Negotiable ) Obtener el precio más reciente
Lugar de origen: -
Precio de pedido mínimo: -
Cantidad de pedido mínimo: 1000 Kilogram
Detalle de embalaje: standard export packing
El tiempo de entrega: 20days with contract
Capacidad de suministro: 100 Ton per Month
Tipo de pago: T/T, L/C
Grupo de productos : -

Send a direct inquiry to this supplier

A:

Mr. hyoung sik < EZEN Global >

quiero saber: