Eco-Guard is an eco-friendly product that is hydrated by the
reaction of aqueous urethane and acrylic resin and shows
excellent adhesion and
forming the elastic coating film provided with elegant color,
flexibility and firming strongly after drying.
Eco-Guard has
excellent weather resistance, chemical resistance and excellent
antibacterial and excellent protection of concrete surfaces
which is suitable
for roofs and roof waterproofing where the elasticity is
required.
â— Inorganic top coat
Construction
Method
â— In order to maximize the performance of product enforce the
surface treatment before the construction as follows
â— *0 square above the construction site is non-woven
construction
Surface
Treatment
①Coated floor must be sufficiently cured (*0 ℃
standards, curing more than *0 days)
â‘¡ Ground laitance, dust, oil and other contaminants are
completely removed (pH7 ~ 9, the water content *0%)
â‘¢ Fill up the gaps or hole with repair putty. Seal the severe
cracks and expansion joints after V-cutting and coat surface
after adjustment
â‘£ Corner facing the wall and the bottom part and lifting part
of the maintenance work.
⑤ Other parts of the construction side, using masking tape to
protect
Construction / primer
work
â‘ After treatment based primer and brush, roller or
spray applied once
â‘¡ Enough paint to be absorbed when applied to the substrate
surface
â‘¢ The coating should be applied uniformly to prevent not to
be thicker coating partially.
â‘£ Primer paint for more than 2 days or rainy day with
moderate to enhance the adhesion between layers of primer and
then a thin
Sand Parpineg (0.2kg / ㎡) for additional application
Construction / moderate
work
â‘ Use a brush, a roller after confirming the complete
drying of the primer hard and apply in one direction
â‘¡ First do not thicken the coating during construction, and 3
times that split shingle work, can maximize the effect of the
shingle tan
â‘¢ Check the status of the application surface with a dry
place, ensure that there are no problems occur, the pinhole,
then carried out
the second application. Applied to the primary and secondary
coating work in the direction of displacement
â‘£ Third coating is working in the same manner as the
secondary work
Construction and
maintenance
â— Refer to the complete drying time to control the pass and
walk to protect the coated surface.
â— Ventilate the indoor well when working with dry
â— To immature work due to fault area is cut suitable area to
be repaired and conduct construction method above
Notes
â— Please be sure to use undiluted.
◠Be sure to keep the temperature more than 5 ℃.
â— If adhere to your skin, wash thoroughly with soap and water
â— Please keep out of reach of children