¿Aún no es miembro de TradeKey.com? Regístrese para conectarse con 9 millones de importadores y exportadores a nivel mundial.
registro |
BOOK A CALL
Book Call On Your Favorite Time

By Signing Up. I agree to TradeKey.com Terms of Use, Privacy Policy, IPR and receive emails related to our services

Contact Us
product
Prev
Scaffolding Metal Board/Plank
Next

Scaffolding Metal Board/Plank

1.5 ~ 10.5 / Piece

|

300 Piece Minimum Order

País:

China

N º de Modelo:

-

Precio FOB:

1.5 ~ 10.5 / Piece Obtener el precio más reciente

Lugar de origen:

-

Precio de pedido mínimo:

1.5 per Piece

Cantidad de pedido mínimo:

300 Piece

Detalle de embalaje:

in pallet or as your request

El tiempo de entrega:

10 to 20 days

Capacidad de suministro:

-

Tipo de pago:

T/T, L/C, D/P

Grupo de productos :

-

Contactar ahora
Miembro Básico

Persona de contacto Ms. Maggie

NO.9 Xiangfu Middle Road, Changsha, Hunan

Contactar ahora

Especificaciones del producto

  • finish:Q235 hot-dipped galvanized

Descripción del producto

Product Description
World galvanized steel plank is an ideal economical & eco-friendly scaffolding solution for scaffolding system and formwork system. A perfect choice for safety & low-cost & high-efficiency construction projects.
 
Advantages:
1. Better Side box design with better anti - deforming capability
2. Strengthen support designs with much stronger support force
3. **0mm support spacing with better anti - deforming capability
4. Hot dip galvanizing surface & lifespan > 5 years
5. Punching design to anti-skid & lighten weight
6. Stiffener design to reinforce the load bearing capacity

Product Specification
Width(mm) Height(mm) Plate Thickness(mm) Length(mm)
**5 *5 1.**2.5 *******0
**0 *5 1.**2.5 *******0
**0 *0 1.**2.5 *******0
**0 *0 1.**2.5 *******0

Our Services
**0% satisfaction guarantee
1. Solve your problems within *4 hours
2. Your feedback is highly valued
3. Update price and new products regularly

FAQ
1. Are you the manufacturer or trader?
We are **0% manufacturer,specializing in scaffolding over *3 years.There are excellent engineers make designs and skillful welding workers.
 
2. What are the most important factors that influence on the quality of frame scaffold?
There are the material type, the sizes of tube, and the surface treatment.
 

País: China
N º de Modelo: -
Precio FOB: 1.5 ~ 10.5 / Piece Obtener el precio más reciente
Lugar de origen: -
Precio de pedido mínimo: 1.5 per Piece
Cantidad de pedido mínimo: 300 Piece
Detalle de embalaje: in pallet or as your request
El tiempo de entrega: 10 to 20 days
Capacidad de suministro: -
Tipo de pago: T/T, L/C, D/P
Grupo de productos : -

Send a direct inquiry to this supplier

A:

Ms. Maggie < Hunan World Scaffolding Co., Ltd. >

quiero saber: