Precio FOB
Obtener el precio más reciente0.6 ~ 2.5 USD / Piece
|5000 Piece Minimum Order
País:
China
N º de Modelo:
-
Precio FOB:
0.6 ~ 2.5 USD / Piece Obtener el precio más reciente
Lugar de origen:
-
Precio de pedido mínimo:
0.6 per Piece
Cantidad de pedido mínimo:
5000 Piece
Detalle de embalaje:
in bulk or as request
El tiempo de entrega:
10 to 25 days
Capacidad de suministro:
100 Ton per Day
Tipo de pago:
T/T, L/C, D/P
Grupo de productos :
-
Persona de contacto Ms. Maggie
NO.9 Xiangfu Middle Road, Changsha, Hunan
Product Description
1.Dimensions:*8.3mm
2.Material:Q**5 carbon steel
3.Nut:*1mm,*2mm,*3mm
4.T-bolt:*0mm,*9mm
5.Weight :0.***1.*5kg or as per your request
6.Standard:EN*4,BS***9,CE and also fit for our domestic standard, through SGS test.
7.Techs:Drop Forged
8.Surface treatment:Self-color,Zinc plated ,Hot dip galvanized
9.Color:Self-color(Black) , White, Yellow
*0.Style:British(also can produce German, American, Japanese and so on)
*1.Quality:good bearing capacity,durable & stable
*2.Price:reasonable & wonderful
*3.OEM service is available
FAQ
1. Are you the manufacturer or trader?
We are **0% manufacturer,specializing in scaffolding over *2 years.There are excellent engineers make designs and skillful welding workers.
2. What are the most important factors that influence on the quality of frame scaffold?
There are the material type, the sizes of tube, and the surface treatment.
País: | China |
N º de Modelo: | - |
Precio FOB: | 0.6 ~ 2.5 / Piece Obtener el precio más reciente |
Lugar de origen: | - |
Precio de pedido mínimo: | 0.6 per Piece |
Cantidad de pedido mínimo: | 5000 Piece |
Detalle de embalaje: | in bulk or as request |
El tiempo de entrega: | 10 to 25 days |
Capacidad de suministro: | 100 Ton per Day |
Tipo de pago: | T/T, L/C, D/P |
Grupo de productos : | - |