¿Aún no es miembro de TradeKey.com? Regístrese para conectarse con 9 millones de importadores y exportadores a nivel mundial. registro |
BOOK A CALL
Book Call On Your Favorite Time

By Signing Up. I agree to TradeKey.com Terms of Use, Privacy Policy, IPR and receive emails related to our services

Contact Us
product
Prev
Q235 Galvanized Scaffolding Metal Plank
Next

Q235 Galvanized Scaffolding Metal Plank

12 ~ 23 USD / Piece

|

100 Piece Minimum Order

País:

China

N º de Modelo:

KH-SW-240-001

Precio FOB:

12 ~ 23 USD / Piece Obtener el precio más reciente

Lugar de origen:

-

Precio de pedido mínimo:

12 per Piece

Cantidad de pedido mínimo:

100 Piece

Detalle de embalaje:

bundled or bulk, as per customer

El tiempo de entrega:

15 days

Capacidad de suministro:

8 Forty-Foot Container per Week

Tipo de pago:

T/T

Grupo de productos :

Contactar ahora
Miembro Básico

Persona de contacto Fu

Room B303, Jingying Garden, No. 3, Jingsha 2nd Road, Shajing Street Office, Shajing Town, Bao'a, Shenzhen, Guangdong

Contactar ahora

Especificaciones del producto

  • 210mmx45mmx1.0mmx3000mm:Galvanized
  • 240mmx45mmx1.0mmx4000mm:Galvanized
  • 250mmx50mmx1.0mmx2000mm:Galvanized
  • 500mmx50mmx1.0mmx1829mm:Galvanized with hook
  • 500mmx50mmx1.0mmx1219mm:Galvanized with hook
  • 480mmx45mmx1.0mmx1219mm:Galvanized with hook

Descripción del producto

Product detail:

 

1.Q**5 Galvanized Scaffolding Metal Plank

 

2.Material:Q**5,Q**5,Q**5

 

3.Surface treat:hot-dipped galvanized

 

4.Width:**0,**5,**0,**0,**0,**0,**0mm

 

5.Thickness: 1.**2.0mm

 

6.Length: To be produced as per your requirement

 

7.Folding box should be more stronger

 

8.Patent holes design to be reduced products' weight

 

9.Patent ribs make products stronger and drain the water providing any rain days 

 

*0.Life time:5 years guarantee

 

Dimension:

 

Item Wide (mm) Height (mm) Thickness (mm) Length (m) Folding Box support bracket Weight (kg)
KH-SW*******1 **0 *5 1.1 1.0 Normal flat support 3.*4
KH-SW*******2 **0 *5 1.1 1.5 Normal flat support 5.*2
KH-SW*******3 **0 *5 1.1 2.0 Normal flat support 6.*9
KH-SW*******4 **0 *5 1.1 2.5 Normal flat support 8.*6
KH-SW*******5 **0 *5 1.1 3.0 Normal flat support *0.*3
KH-SW*******6 **0 *5 1.1 4.0 Normal flat support *3.*8
KH-SW*******7 **0 *5 1.1 1.0 Normal rectangular support 3.*4
KH-SW*******8 **0 *5 1.1 1.5 Normal rectangular support 5.*2
KH-SW*******9 **0 *5 1.1 2.0 Normal rectangular support 7.*9
KH-SW*******0 **0 *5 1.1 2.5 Normal rectangular support 9.*6
KH-SW*******1 **0 *5 1.1 3.0 Normal rectangular support *0.*3
KH-SW*******2 **0 *5 1.1 4.0 Normal rectangular support *4.*8
KH-SW*******3 **0 *5 1.1 1.0 Normal trapezoid support 3.*1
KH-SW*******4 **0 *5 1.1 1.5 Normal trapezoid support 5.*6
KH-SW*******5 **0 *5 1.1 2.0 Normal trapezoid support 7.*0
KH-SW*******6 **0 *5 1.1 2.5 Normal trapezoid support 8.*4
KH-SW*******7 **0 *5 1.1 3.0 Normal trapezoid support *0.*8
KH-SW*******8 **0 *5 1.1 4.0 Normal trapezoid support *4.*7
KH-SW*******9 **0 *5 1.1 1.0 Equilateral flat support 3.*5
KH-SW*******0 **0 *5 1.1 1.5 Equilateral flat support 5.*2
KH-SW*******1 **0 *5 1.1 2.0 Equilateral flat support 6.*9
KH-SW*******2 **0 *5 1.1 2.5 Equilateral flat support 8.*6
KH-SW*******3 **0 *5 1.1 3.0 Equilateral flat support  
KH-SW*******4 **0 *5 1.1 4.0 Equilateral flat support *3.*8
KH-SW*******5 **0 *5 1.1 1.0 Equilateral rectangular support 3.*5
KH-SW*******6 **0 *5 1.1 1.5 Equilateral rectangular support 5.*2
KH-SW*******7 **0 *5 1.1 2.0 Equilateral rectangular support 7.*9
KH-SW*******8 **0 *5 1.1 2.5 Equilateral rectangular support 9.*6
KH-SW*******9 **0 *5 1.1 3.0 Equilateral rectangular support *0.*3
KH-SW*******0 **0 *5 1.1 4.0 Equilateral rectangular support *4.*8
KH-SW*******1 **0 *5 1.1 1.0 Equilateral trapezoid support 3.*1
KH-SW*******2 **0 *5 1.1 1.5 Equilateral trapezoid support 5.*6
KH-SW*******3 **0 *5 1.1 2.0 Equilateral trapezoid support 7.*0
KH-SW*******4 **0 *5 1.1 2.5 Equilateral trapezoid support 8.*4
KH-SW*******5 **0 *5 1.1 3.0 Equilateral trapezoid support *0.*7
KH-SW*******6 **0 *5 1.1 4.0 Equilateral trapezoid support *3.*4
KH-SW*******7 **0 *5 1.0 1.0 Normal flat support 3.*7
KH-SW*******8 **0 *5 1.0 2.0 Normal flat support 6.*3
KH-SW*******9 **0 *5 1.0 3.0 Normal flat support 9.*0
KH-SW*******0 **0 *5 1.0 4.0 Normal flat support *2.*7
KH-SW*******1 **0 *5 1.0 1.0 Normal trapezoid support 3.*5
KH-SW*******2 **0 *5 1.0 2.0 Normal trapezoid support 6.*1
KH-SW*******3 **0 *5 1.0 3.0 Normal trapezoid support 9.*8
KH-SW*******4 **0 *5 1.0 4.0 Normal trapezoid support *2.*5
KH-SW*******5 **0 *5 1.2 1.0 Normal rectangular support 4.*6
KH-SW*******6 **0 *5 1.2 2.0 Normal rectangular support 7.*2
KH-SW*******7 **0 *5 1.2 3.0 Normal rectangular support *1.*8
KH-SW*******8 **0 *5 1.2 4.0 Normal rectangular support *4.*4

 

 

Features:

 

1. The Pierced Steel Plank(PSP)is strong, light, simple, fool proof, safe and inexpensive.

 

2. It is so simple that it can be laid on any fairly level piece of land with a few days work.

 

3. It is so foolproof that if some parts are lost, it will still be useful. It must be safe for

any type of construction, under any weather conditions.

 

4. It is be so light that it can be transported swiftly and easily to any spot

 

5. The PSP(Piereced Steel Plank) was designed with holes to reduce the weight,

improve traction and facilitate drainage. Flanging the holes kept the mat durable

by compensating for the strength lost by removing a portion of the metal

 

 

Wide variety of consumers:

 

1. Temporary and permanent aircraft landing fields or runways

 

2. Temporary roadways or access routes for trucks, heavy equipment, backhoes, concrete trucks, tree trimmers and cranes.

 

3. Construction Sites

 

4. Helicopter Landing Pads

 

5. Irrigation Tracks

 

6. Launches and boat ramp extensions

 

7. Corrals and chutes for livestock

 

8. Warehouse flooring 9. Mobile home moving

 

*0. RV tracks or storage areas

 

*1. Storage platforms for heavy equipment, supplies or runways.

 

 

How to extend scaffolding walking Board

 

1.Have a 'competent person' assess and document the needs of the area for extended

scaffolding. A 'competent person' in some states is required to have special licensing,

and in others experience with scaffolding set up is enough. What is important is that

you keep some form of documentation that the person designated as 'competent'

approves each step of the scaffolding assembly

 

2.Assemble the frame of your scaffolding system. Whether it is mobile or stationary,

make sure that the supports for your scaffolding plans follow the assembly plans

 

3.Lay your first plank across the supports of your platform. Have your competent

person check that each plan extends a minimum of 6 inches and a maximum of

*2 inches past any support bracket.

 

4.Extend your scaffolding plank by laying the next plank over it. If the span

of your support is 7 feet, your plans must overlap a minimum of 6 inches up

to a maximum of *2 inches. If the span of your plank support is *0 feet, the boards

must overlap *2 inches.

 

5.You may provide cleats to additionally connect your extended scaffold planks again.

Ask your competent person to designate that the cleats are provided and used only

to prevent the scaffold planks from sliding and not as a means of providing any
 

País: China
N º de Modelo: KH-SW-240-001
Precio FOB: 12 ~ 23 / Piece Obtener el precio más reciente
Lugar de origen: -
Precio de pedido mínimo: 12 per Piece
Cantidad de pedido mínimo: 100 Piece
Detalle de embalaje: bundled or bulk, as per customer
El tiempo de entrega: 15 days
Capacidad de suministro: 8 Forty-Foot Container per Week
Tipo de pago: T/T
Grupo de productos : Scaffolding Plank

Send a direct inquiry to this supplier

A:

Fu < Shenzhen King Hardware >

quiero saber: