Precio FOB
Obtener el precio más reciente12 ~ 23 USD / Piece
|100 Piece Minimum Order
País:
China
N º de Modelo:
KH-SW-240-001
Precio FOB:
12 ~ 23 USD / Piece Obtener el precio más reciente
Lugar de origen:
-
Precio de pedido mínimo:
12 per Piece
Cantidad de pedido mínimo:
100 Piece
Detalle de embalaje:
bundled or bulk, as per customer
El tiempo de entrega:
15 days
Capacidad de suministro:
8 Forty-Foot Container per Week
Tipo de pago:
T/T
Grupo de productos :
China
Persona de contacto Fu
Room B303, Jingying Garden, No. 3, Jingsha 2nd Road, Shajing Street Office, Shajing Town, Bao'a, Shenzhen, Guangdong
Product detail:
1.Q**5 Galvanized Scaffolding Metal Plank
2.Material:Q**5,Q**5,Q**5
3.Surface treat:hot-dipped galvanized
4.Width:**0,**5,**0,**0,**0,**0,**0mm
5.Thickness: 1.**2.0mm
6.Length: To be produced as per your requirement
7.Folding box should be more stronger
8.Patent holes design to be reduced products' weight
9.Patent ribs make products stronger and drain the water providing any rain days
*0.Life time:5 years guarantee
Dimension:
Item | Wide (mm) | Height (mm) | Thickness (mm) | Length (m) | Folding Box | support bracket | Weight (kg) |
KH-SW*******1 | **0 | *5 | 1.1 | 1.0 | Normal | flat support | 3.*4 |
KH-SW*******2 | **0 | *5 | 1.1 | 1.5 | Normal | flat support | 5.*2 |
KH-SW*******3 | **0 | *5 | 1.1 | 2.0 | Normal | flat support | 6.*9 |
KH-SW*******4 | **0 | *5 | 1.1 | 2.5 | Normal | flat support | 8.*6 |
KH-SW*******5 | **0 | *5 | 1.1 | 3.0 | Normal | flat support | *0.*3 |
KH-SW*******6 | **0 | *5 | 1.1 | 4.0 | Normal | flat support | *3.*8 |
KH-SW*******7 | **0 | *5 | 1.1 | 1.0 | Normal | rectangular support | 3.*4 |
KH-SW*******8 | **0 | *5 | 1.1 | 1.5 | Normal | rectangular support | 5.*2 |
KH-SW*******9 | **0 | *5 | 1.1 | 2.0 | Normal | rectangular support | 7.*9 |
KH-SW*******0 | **0 | *5 | 1.1 | 2.5 | Normal | rectangular support | 9.*6 |
KH-SW*******1 | **0 | *5 | 1.1 | 3.0 | Normal | rectangular support | *0.*3 |
KH-SW*******2 | **0 | *5 | 1.1 | 4.0 | Normal | rectangular support | *4.*8 |
KH-SW*******3 | **0 | *5 | 1.1 | 1.0 | Normal | trapezoid support | 3.*1 |
KH-SW*******4 | **0 | *5 | 1.1 | 1.5 | Normal | trapezoid support | 5.*6 |
KH-SW*******5 | **0 | *5 | 1.1 | 2.0 | Normal | trapezoid support | 7.*0 |
KH-SW*******6 | **0 | *5 | 1.1 | 2.5 | Normal | trapezoid support | 8.*4 |
KH-SW*******7 | **0 | *5 | 1.1 | 3.0 | Normal | trapezoid support | *0.*8 |
KH-SW*******8 | **0 | *5 | 1.1 | 4.0 | Normal | trapezoid support | *4.*7 |
KH-SW*******9 | **0 | *5 | 1.1 | 1.0 | Equilateral | flat support | 3.*5 |
KH-SW*******0 | **0 | *5 | 1.1 | 1.5 | Equilateral | flat support | 5.*2 |
KH-SW*******1 | **0 | *5 | 1.1 | 2.0 | Equilateral | flat support | 6.*9 |
KH-SW*******2 | **0 | *5 | 1.1 | 2.5 | Equilateral | flat support | 8.*6 |
KH-SW*******3 | **0 | *5 | 1.1 | 3.0 | Equilateral | flat support | |
KH-SW*******4 | **0 | *5 | 1.1 | 4.0 | Equilateral | flat support | *3.*8 |
KH-SW*******5 | **0 | *5 | 1.1 | 1.0 | Equilateral | rectangular support | 3.*5 |
KH-SW*******6 | **0 | *5 | 1.1 | 1.5 | Equilateral | rectangular support | 5.*2 |
KH-SW*******7 | **0 | *5 | 1.1 | 2.0 | Equilateral | rectangular support | 7.*9 |
KH-SW*******8 | **0 | *5 | 1.1 | 2.5 | Equilateral | rectangular support | 9.*6 |
KH-SW*******9 | **0 | *5 | 1.1 | 3.0 | Equilateral | rectangular support | *0.*3 |
KH-SW*******0 | **0 | *5 | 1.1 | 4.0 | Equilateral | rectangular support | *4.*8 |
KH-SW*******1 | **0 | *5 | 1.1 | 1.0 | Equilateral | trapezoid support | 3.*1 |
KH-SW*******2 | **0 | *5 | 1.1 | 1.5 | Equilateral | trapezoid support | 5.*6 |
KH-SW*******3 | **0 | *5 | 1.1 | 2.0 | Equilateral | trapezoid support | 7.*0 |
KH-SW*******4 | **0 | *5 | 1.1 | 2.5 | Equilateral | trapezoid support | 8.*4 |
KH-SW*******5 | **0 | *5 | 1.1 | 3.0 | Equilateral | trapezoid support | *0.*7 |
KH-SW*******6 | **0 | *5 | 1.1 | 4.0 | Equilateral | trapezoid support | *3.*4 |
KH-SW*******7 | **0 | *5 | 1.0 | 1.0 | Normal | flat support | 3.*7 |
KH-SW*******8 | **0 | *5 | 1.0 | 2.0 | Normal | flat support | 6.*3 |
KH-SW*******9 | **0 | *5 | 1.0 | 3.0 | Normal | flat support | 9.*0 |
KH-SW*******0 | **0 | *5 | 1.0 | 4.0 | Normal | flat support | *2.*7 |
KH-SW*******1 | **0 | *5 | 1.0 | 1.0 | Normal | trapezoid support | 3.*5 |
KH-SW*******2 | **0 | *5 | 1.0 | 2.0 | Normal | trapezoid support | 6.*1 |
KH-SW*******3 | **0 | *5 | 1.0 | 3.0 | Normal | trapezoid support | 9.*8 |
KH-SW*******4 | **0 | *5 | 1.0 | 4.0 | Normal | trapezoid support | *2.*5 |
KH-SW*******5 | **0 | *5 | 1.2 | 1.0 | Normal | rectangular support | 4.*6 |
KH-SW*******6 | **0 | *5 | 1.2 | 2.0 | Normal | rectangular support | 7.*2 |
KH-SW*******7 | **0 | *5 | 1.2 | 3.0 | Normal | rectangular support | *1.*8 |
KH-SW*******8 | **0 | *5 | 1.2 | 4.0 | Normal | rectangular support | *4.*4 |
Features:
1. The Pierced Steel Plank(PSP)is strong, light, simple, fool proof, safe and inexpensive.
2. It is so simple that it can be laid on any fairly level piece of land with a few days work.
3. It is so foolproof that if some parts are lost, it will still be useful. It must be safe for
any type of construction, under any weather conditions.
4. It is be so light that it can be transported swiftly and easily to any spot
5. The PSP(Piereced Steel Plank) was designed with holes to reduce the weight,
improve traction and facilitate drainage. Flanging the holes kept the mat durable
by compensating for the strength lost by removing a portion of the metal
Wide variety of consumers:
1. Temporary and permanent aircraft landing fields or runways
2. Temporary roadways or access routes for trucks, heavy equipment, backhoes, concrete trucks, tree trimmers and cranes.
3. Construction Sites
4. Helicopter Landing Pads
5. Irrigation Tracks
6. Launches and boat ramp extensions
7. Corrals and chutes for livestock
8. Warehouse flooring 9. Mobile home moving
*0. RV tracks or storage areas
*1. Storage platforms for heavy equipment, supplies or runways.
How to extend scaffolding walking Board
1.Have a 'competent person' assess and document the needs of the area for extended
scaffolding. A 'competent person' in some states is required to have special licensing,
and in others experience with scaffolding set up is enough. What is important is that
you keep some form of documentation that the person designated as 'competent'
approves each step of the scaffolding assembly
2.Assemble the frame of your scaffolding system. Whether it is mobile or stationary,
make sure that the supports for your scaffolding plans follow the assembly plans
3.Lay your first plank across the supports of your platform. Have your competent
person check that each plan extends a minimum of 6 inches and a maximum of
*2 inches past any support bracket.
4.Extend your scaffolding plank by laying the next plank over it. If the span
of your support is 7 feet, your plans must overlap a minimum of 6 inches up
to a maximum of *2 inches. If the span of your plank support is *0 feet, the boards
must overlap *2 inches.
5.You may provide cleats to additionally connect your extended scaffold planks again.
Ask your competent person to designate that the cleats are provided and used only
to prevent the scaffold planks from sliding and not as a means of
providing any
País: | China |
N º de Modelo: | KH-SW-240-001 |
Precio FOB: | 12 ~ 23 / Piece Obtener el precio más reciente |
Lugar de origen: | - |
Precio de pedido mínimo: | 12 per Piece |
Cantidad de pedido mínimo: | 100 Piece |
Detalle de embalaje: | bundled or bulk, as per customer |
El tiempo de entrega: | 15 days |
Capacidad de suministro: | 8 Forty-Foot Container per Week |
Tipo de pago: | T/T |
Grupo de productos : | Scaffolding Plank |