¿Aún no es miembro de TradeKey.com? Regístrese para conectarse con 9 millones de importadores y exportadores a nivel mundial. registro |
BOOK A CALL
Book Call On Your Favorite Time
Code
🗘

By Signing Up. I agree to TradeKey.com Terms of Use, Privacy Policy, IPR and receive emails related to our services

Contact Us
product
Prev
mixed type plastic running track mixed type plastic running track
Next

mixed type plastic running track

|

1000 Square Meter Minimum Order

País:

China

N º de Modelo:

-

Precio FOB:

Lugar de origen:

-

Precio de pedido mínimo:

-

Cantidad de pedido mínimo:

1000 Square Meter

Detalle de embalaje:

under customer's confirmation

El tiempo de entrega:

within 10-15days after confirmation

Capacidad de suministro:

15000 Square Meter per Month

Tipo de pago:

T/T, L/C

Grupo de productos :

-

Contactar ahora
Miembro Básico

Persona de contacto Ms. Olivia

Han Kow north Road, Wuhan, Hubei

Contactar ahora

Especificaciones del producto

Descripción del producto

Construction technology process of mixed type plastic runway



1.Make waterproof processing for the concrete, after *4 hours for maintenance, we can pave the bottom of runway.



2.The products ratio of PU-A and PU-B is 1:5, the catalyst is 1% of total dosage of PU. The runway substrate is according to international standard mixed with *5%**0% high elasticity black colloidal particles with particle size of **4mm, after mixing well, then pour them into ground and make it smooth. The laying thickness is ***0mm. Then keep *4hours for maintenance&solidifying.



3.The proportion of finishing paint A material on runway and B material is 1:3. And mixing them well for following use. Then mixing EPDM with particle size of **2mm and surface paint well, with proportion of 1:1, then pour them into paver. Let spray gun's angle keep *0 degree for spraying. After finishing spraying, we need *4hour for solidifying&maintenance. Spraying the runway in the opposite direction again. The recommended dosage of finishing paint is 1.2kg per square, EPDM particles are 1.1kg per square, the catalyst is  0.**2kg per square, then it still needs *4 hours to solidify.



  4.After finishing *4hours solidifying&maintenance, we can mark line on the ground.Finishing construction of all progress, after 7days for maintenance for the runway, we can put it into use.

 

País: China
N º de Modelo: -
Precio FOB: Obtener el precio más reciente
Lugar de origen: -
Precio de pedido mínimo: -
Cantidad de pedido mínimo: 1000 Square Meter
Detalle de embalaje: under customer's confirmation
El tiempo de entrega: within 10-15days after confirmation
Capacidad de suministro: 15000 Square Meter per Month
Tipo de pago: T/T, L/C
Grupo de productos : -

Send a direct inquiry to this supplier

A:

Ms. Olivia < GUANGZHOU GREENWALK SPORTS PLASTIC MATERIAL CO., LTD. >

quiero saber: