Precio FOB
Obtener el precio más reciente5 ~ 10 / Piece ( Negotiable )
|1000 Piece Minimum Order
País:
China
N º de Modelo:
OL
Precio FOB:
5 ~ 10 / Piece ( Negotiable )Obtener el precio más reciente
Lugar de origen:
Jiangsu, China (Mainland)
Precio de pedido mínimo:
5 per Piece
Cantidad de pedido mínimo:
1000 Piece
Detalle de embalaje:
Strapped bundle wrapped in plastic
El tiempo de entrega:
production leading time 30 days
Capacidad de suministro:
100000 Piece per Month
Tipo de pago:
T/T
Grupo de productos :
-
Persona de contacto Ms. c
No. 80, North Henggang Road, Taizhou, Jiangsu
When
the desired steel composition and temperature has been reached, the
furnace tap hole is opened through a combination of drilling and
tapping using oxygen lances. Lances are coupled to a high pressure
oxygen supply, the end of the lance is ignited and through careful
and skillful manipulation, the tap hole clay which can be up to
**0mm thick is effectively burnt away, facilitating the pouring of
the molten metal for further processing.
Ladle well blocks require cleaning once the casting process has
been completed. Ladles are tipped to remove the slag. Oxygen lances
are employed to clean both the upper and lower nozzles and if
necessary, the bottom of the ladle is also cleaned with a lance
tube if it contains impacted debris.
País: | China |
N º de Modelo: | OL |
Precio FOB: | 5 ~ 10 / Piece ( Negotiable ) Obtener el precio más reciente |
Lugar de origen: | Jiangsu, China (Mainland) |
Precio de pedido mínimo: | 5 per Piece |
Cantidad de pedido mínimo: | 1000 Piece |
Detalle de embalaje: | Strapped bundle wrapped in plastic |
El tiempo de entrega: | production leading time 30 days |
Capacidad de suministro: | 100000 Piece per Month |
Tipo de pago: | T/T |
Grupo de productos : | - |