Precio FOB
Obtener el precio más reciente|
1000 Piece Minimum Order
País:
China
N º de Modelo:
YH-10003
Precio FOB:
Lugar de origen:
China
Precio de pedido mínimo:
-
Cantidad de pedido mínimo:
1000 Piece
Detalle de embalaje:
1pc/opp bag
El tiempo de entrega:
20 days
Capacidad de suministro:
5000000 Piece per Week
Tipo de pago:
T/T
Grupo de productos :
-
Persona de contacto Ms. Sara
shipai, Dongguan, Guangdong
STEP 1 Making the Mold
Computerized system is used to engrave your design on to the mold
surface.
STEP 2 Injection
Material injected in to the mold
STEP 3 Elimination
On completion of injection, waste material is eliminated to reveal
the completed design.
STEP 4 Attachment
he back attachment is spot welded on to each piece.
STEP 5 Polishing
The surface of the metal is polished until smooth.
STEP 6 Plating
Various plating colors can now be processed. The quality of plating
varied with the length of time the metal is inmersed in the plating
solution.
STEP 7 Inspection and Packing
All items are strictly inspected before delivery. Customer's
satisfaction is guaranteed!
País: | China |
N º de Modelo: | YH-10003 |
Precio FOB: | Obtener el precio más reciente |
Lugar de origen: | China |
Precio de pedido mínimo: | - |
Cantidad de pedido mínimo: | 1000 Piece |
Detalle de embalaje: | 1pc/opp bag |
El tiempo de entrega: | 20 days |
Capacidad de suministro: | 5000000 Piece per Week |
Tipo de pago: | T/T |
Grupo de productos : | - |