Precio FOB
Obtener el precio más reciente800 ~ 1200 USD / Ton ( Negotiable )
|1 Ton Minimum Order
País:
China
N º de Modelo:
-
Precio FOB:
800 ~ 1200 USD / Ton ( Negotiable )Obtener el precio más reciente
Lugar de origen:
-
Precio de pedido mínimo:
800 per Ton
Cantidad de pedido mínimo:
1 Ton
Detalle de embalaje:
-
El tiempo de entrega:
15-21 Days
Capacidad de suministro:
10000 Ton per Year
Tipo de pago:
Other, PayPal, Money Gram, Western Union, D/P, D/A, L/C, T/T
Grupo de productos :
-
Persona de contacto Ms. Renee
Changfu Project Area,BaishuInd. Zone, Guiyang County, Hunan Province.PRC(424400), Changsha, Hunan
What Is
Balley Bridge?
It was
developed by the British during World War Il for military use and
saw extensive use by both British and the
American military
engineering units. A Bailey bridge had the advantages of requiring
no special tools or heavy equipment
to assemble.
It's easy to assemble and convenient. The function also differs on
differs on different users of the bridge
which could be
pedestrians, common vehicles (car, bus,truck), heavy military
equipment (tank) or the railway.
Hunan Road & Bridge Engineering Machinery Co., Ltd is located
in the famous tourist city - Chenzhou city of
Hunan province.Tuotian developed from Hunan
Changzheng Bridge Equipment Manufacturing Co., Ltd & Hunan
Shenghua Steel Structure
Building Co.,Ltd, specialized in produce HD**0,**1 assembled
highway bridge steel, urban pedestrian
auxiliary bridge,
urban elevated steel box girder bridge, all span construction
trestle& high-speed/ high-speed template&
gantry crane and
gantry crane walking beam span bridge. We win a good reputation not
only in domestic market but also
other country,
as our excellent service in Steel structure&Bailey Bridge
manufacture,R&D,Producing, sales, leasing,
installation and
maintenance service.We get the ISO***1:***8international quality
management system certification
and ISO****1:***4 environmental management
system certification, all products of the company strictly
according to the ministry
of communications issued by the "technical specification for
construction of highway bridge
JT/T*******8 processing, production, suitable for all
kinds of engineering construction or traffic demand, at the same
time with the standard
components can be used interchangeably.Our business development
philosophy is: Custom First, Timely
delivery
, Quality
is life! Waiting for your inquiry!
Surface treatment | Painting,Galvanized |
Color | Green, , Customize |
Material | Q**5B, Q**5B, Q**5B |
Orginal | Hunan, China |
Certificate | ISO***1 |
Feature | Suspensiongreat stability and long fatigue life |
Advantages |
1.Stable and safety 2.Structure is durable for*0 years 3.Fast and easy to install 4.Extensive Applications: Vally, Dangerous bridge reinforcement, Pedestrian bridge, Terminal Building, Special-shaped Buildings, etc 5.High anti-rust performance |
País: | China |
N º de Modelo: | - |
Precio FOB: | 800 ~ 1200 / Ton ( Negotiable ) Obtener el precio más reciente |
Lugar de origen: | - |
Precio de pedido mínimo: | 800 per Ton |
Cantidad de pedido mínimo: | 1 Ton |
Detalle de embalaje: | - |
El tiempo de entrega: | 15-21 Days |
Capacidad de suministro: | 10000 Ton per Year |
Tipo de pago: | Other, PayPal, Money Gram, Western Union, D/P, D/A, L/C, T/T |
Grupo de productos : | - |