Precio FOB
Obtener el precio más reciente820 ~ 1280 USD / ( Negotiable )
|1 Ton Minimum Order
País:
China
N º de Modelo:
CB200, CB100/321
Precio FOB:
820 ~ 1280 USD / ( Negotiable )Obtener el precio más reciente
Lugar de origen:
Hunan China
Precio de pedido mínimo:
820
Cantidad de pedido mínimo:
1 Ton
Detalle de embalaje:
-
El tiempo de entrega:
15 to 21
Capacidad de suministro:
10000 Ton per Year
Tipo de pago:
PayPal, Money Gram, Western Union, D/P, D/A, L/C, T/T
Grupo de productos :
-
Persona de contacto Ms. Renee
Changfu Project Area,BaishuInd. Zone, Guiyang County, Hunan Province.PRC(424400), Changsha, Hunan
What Is Balley Bridge?
It was developed by the British during World War ll for military
use and saw extensive use by both British and the American
military engineering units. A Bailey bridge had the advantages of
requiring no special tools or heavy equipment to
assemble. It's easy to assemble and convenient. The function also
differs on differs on different users of the bridge which
could be pedestrians, common vehicles (car, bus,truck), heavy
military equipment (tank) or the railway.
Surface treatment | Painting, Galvanized |
Color | Green,Customize |
Material | Q**5B,Q**5B, Q**5B |
Orginal | Hunan, China |
Certificate | ISO***1 |
Feature | Suspensiongreat stability and long fatigue life |
Advantages |
1.Stable and safety 2.Structure is durable for *0 years 3.Fast and easy to install 4.Extensive Applications:Vally, Dangerous bridge reinforcement, Pedestrian bridge, Terminal Building, Special-shaped Buildings, etc 5.High anti-rust performance |
País: | China |
N º de Modelo: | CB200, CB100/321 |
Precio FOB: | 820 ~ 1280 / ( Negotiable ) Obtener el precio más reciente |
Lugar de origen: | Hunan China |
Precio de pedido mínimo: | 820 |
Cantidad de pedido mínimo: | 1 Ton |
Detalle de embalaje: | - |
El tiempo de entrega: | 15 to 21 |
Capacidad de suministro: | 10000 Ton per Year |
Tipo de pago: | PayPal, Money Gram, Western Union, D/P, D/A, L/C, T/T |
Grupo de productos : | - |