¿Aún no es miembro de TradeKey.com? Regístrese para conectarse con 9 millones de importadores y exportadores a nivel mundial.
registro |
BOOK A CALL
Book Call On Your Favorite Time

By Signing Up. I agree to TradeKey.com Terms of Use, Privacy Policy, IPR and receive emails related to our services

Contact Us
product
Prev
Foundation construction piling equipment /piling machine/pile driver  180T Foundation construction piling equipment /piling machine/pile driver  180T
Next

Foundation construction piling equipment /piling machine/pile driver 180T

120000 ~ 250000 / Set ( Negotiable )

|

1 Set Minimum Order

País:

China

N º de Modelo:

ZYC180B

Precio FOB:

120000 ~ 250000 / Set ( Negotiable ) Obtener el precio más reciente

Lugar de origen:

-

Precio de pedido mínimo:

120000 per Set

Cantidad de pedido mínimo:

1 Set

Detalle de embalaje:

main machine nude packed while key parts packed by plastic paper &am

El tiempo de entrega:

30days after receipt of deposit

Capacidad de suministro:

250 Set per Year

Tipo de pago:

L/C, T/T

Grupo de productos :

-

Contactar ahora
Miembro Básico

Persona de contacto Ruby

Liuyang Manufacturing Industrial Park,Changsha,Hunan,China, Changsha, Hunan

Contactar ahora

Especificaciones del producto

  • Piling speed (m/min):11m
  • Demension:10.3x5.9x2.9m
  • Rate piling pressure:1800KN
  • Warranty time:12 months

Descripción del producto

Foundation construction /piling machine/pile driver  **0T

Hydraulic press-in/what is the advantage of the hydraulic pile driver
?

1)Free of noise, vibration and pollution; Suitable for operations in urban areas or country sites

2) Able to install a wide range of concrete pile sizes from **0mm X **0mm to **0mm X **0mm and spun piles from **0mm to **0mm diameter

3) Easy movement: X-Y direction and rotation

4) Wide base, low center of gravity and stable; Suitable for various types of ground condition

5) Easily dismantled for transportation

6)Pile jacking load is applied continuously and evenly, without hammering and vibration

7) Able to handle individual cast pile length exceeding *2m, thus reducing the number of welding joint

8) No heavy reinforcement needed for the pile as compared to a hammer-driven system

9) Excellent piling accuracy

*0) Hassle-free operation and maintenance



T-works offer worry-free after sales service:

Installation and adjustment of the machine on site

Training the operator and the maintanace people

Regular inspection of the machine

Branchs overseas offer quick response within *4 hours upon customer's instruction.

País: China
N º de Modelo: ZYC180B
Precio FOB: 120000 ~ 250000 / Set ( Negotiable ) Obtener el precio más reciente
Lugar de origen: -
Precio de pedido mínimo: 120000 per Set
Cantidad de pedido mínimo: 1 Set
Detalle de embalaje: main machine nude packed while key parts packed by plastic paper &am
El tiempo de entrega: 30days after receipt of deposit
Capacidad de suministro: 250 Set per Year
Tipo de pago: L/C, T/T
Grupo de productos : -

Send a direct inquiry to this supplier

A:

Ruby < Changsha Tianwei Engineering Machinery Manufacturing Co., Ltd. >

quiero saber: