Precio FOB
Obtener el precio más reciente( Negotiable )
|20 Metric Ton Minimum Order
País:
China
N º de Modelo:
23
Precio FOB:
( Negotiable )Obtener el precio más reciente
Lugar de origen:
Henan, China
Precio de pedido mínimo:
-
Cantidad de pedido mínimo:
20 Metric Ton
Detalle de embalaje:
In 1000kg plastic woven bag
El tiempo de entrega:
Within 30 days aftetr signing the contract
Capacidad de suministro:
500 Metric Ton per Month
Tipo de pago:
T/T, L/C
Grupo de productos :
-
Persona de contacto Mr. Chaomei
Wencui Street, XUCHANG, Henan
With the development of iron & steel industry, it's required that the total impurities in steel cannot exceed **0ppm, i. e., the so-called pure steel, which requires that the phosphor content is ≤ *0ppm. This will be difficult for converter and LF equipment. Therefore, molten iron must be pretreated. This product mainly adopts high-calcium compound pre-melting materials. The product ingredient is uniform and quality is stable. It can effectively improve converter metallurgical process, promote slagging, strengthen dephosphorization. It's pollution free. The unit consumption is ****5kg/t. S. The dephosphorization rate is *5%**0%. It's suitable for converter dephosphorization and pretreatment of molten iron.
Specificatons:
***0mm, ***0mm
Fe: ****5%
Ca: ****0%
SiO2: 5%max
Al2O3: 4%max
S: 0.1%max
Packing: In ***0kg plastic woven bag.
País: | China |
N º de Modelo: | 23 |
Precio FOB: | ( Negotiable ) Obtener el precio más reciente |
Lugar de origen: | Henan, China |
Precio de pedido mínimo: | - |
Cantidad de pedido mínimo: | 20 Metric Ton |
Detalle de embalaje: | In 1000kg plastic woven bag |
El tiempo de entrega: | Within 30 days aftetr signing the contract |
Capacidad de suministro: | 500 Metric Ton per Month |
Tipo de pago: | T/T, L/C |
Grupo de productos : | - |