Descripción del producto
product
character
A. bentonite
rubber waterstop is made of hydrophilic water expansion resin
and compound bentonite. The principle is that the hydrophilic
part of the rubber combine with water and
self-expansion
B. the
hydrophilic part of the water stop material will absorb water
and expand. The irregular expansion will fill the crack to stop
leaking
C. the
expansion rate is 3times, it can fill the crack completely and
its leak proof effect is good.
D. This
product does not contain harmful substance or heavy metal safe
construction and no pollution.
product function
1. concrete
second joint crack water stop material
2. middle
pile hole joint water stop material
3. steel
profile and concrete joint water stop material
4. PVC
pipe, iron pipe and concrete joint water stop
material
5. kinds
of crack leaking water stop material
1. before pouring concrete in
the next section, has emerged the vertical (horizontal) or
transverse to the (Central) to the construction joints shall be
installed with water to the interface.
Installation Technology
Details 2
.how to fix water to take the lead board, they have under the
framework of the construction methods and machinery equipment
capacity to identify, can be nails, bolts or wire fixation. In
short its fixation by the construction workers to fully exercise
its imagination, to set aside groove convenient, fast, materials
and purposes. 3. a fixed water to be pasted in the construction
joint, the latter poured joint interface should be kept dry, flat
seam construction to eliminate the interface before the scum, dust
and debris.
4, water to install the site is
confirmed, the need to install the water to the interface and
water to the bottom are coated with a thin layer of adhesive, to
be volatile for some time before glue paste, or high strength
screw water to a fixed position in the established
installed.
5. In case of wet or
uneven concrete interface, fixed on the adhesive paste is not
strong, the visual condition with high-strength concrete nails to
further enhance fixation. Short water to be in close contact with
the concrete interface, fixed rate real, to prevent loss of water
to seepage from the interface and the
role.
6, with water to make the water
to locate installed by pouring concrete package, package
thickness> *0mm.
7, with water to extend the use
of joints used to connect overlapping methods lap, lapping paste
and then use high-strength outer nail fixed, the installation
path along the construction joint form a closed loop, during
which breakpoints can not stay.
8, water to locate the next one
after the pouring of concrete, should avoid being soaked in rain
and other water immersion.
9, pouring concrete vibrators
should be touched with water to avoid vibration
rods.
*0, with water to storage and
transport, avoid moisture and compressive
deformation.
País: |
China |
N º de Modelo: |
WS2520
|
Precio FOB: |
(Negociable)
Obtener el precio más reciente
|
Lugar de origen: |
China |
Precio de pedido mínimo: |
- |
Cantidad de pedido mínimo: |
2000 Meter |
Detalle de embalaje: |
blank carton |
El tiempo de entrega: |
15days |
Capacidad de suministro: |
1000000 Meter per Month |
Tipo de pago: |
T/T |
Grupo de productos : |
waterstop
|