Precio FOB
Obtener el precio más reciente20 ~ 80 / Unit ( Negotiable )
|50 Unit Minimum Order
País:
China
N º de Modelo:
IGO-D04
Precio FOB:
20 ~ 80 / Unit ( Negotiable )Obtener el precio más reciente
Lugar de origen:
Luoyang,China
Precio de pedido mínimo:
20 per Unit
Cantidad de pedido mínimo:
50 Unit
Detalle de embalaje:
Knocked down structure, 1 pcs/carton (polyfoam + 5 layers corrugated carton)
El tiempo de entrega:
15-25 days after receiving deposit
Capacidad de suministro:
10000 Unit per Month
Tipo de pago:
Money Gram, L/C, T/T
Grupo de productos :
Persona de contacto Ms. Eva
Rm. 1121, Wuzhou Building, No. 248 Kaiyuan Rd., Luoyang, Henan
• Stable front frame structure.
• Central locking system.
• Exported to Europe, America, Middle-East, Africa.
• Anti-tilt mechanism.
• Each drawer is suitable for all legal sizes.
• 3 sections telescopic silent ball bearing slide.
• Knocked down structure, easy assembling and saving cost.
• Each drawer has 2 steel adjustable dividers for hanging files.
• Standard drawer loading capacity: ****0kgs (up to metal thickness).
Loading capacity test:
País: | China |
N º de Modelo: | IGO-D04 |
Precio FOB: | 20 ~ 80 / Unit ( Negotiable ) Obtener el precio más reciente |
Lugar de origen: | Luoyang,China |
Precio de pedido mínimo: | 20 per Unit |
Cantidad de pedido mínimo: | 50 Unit |
Detalle de embalaje: | Knocked down structure, 1 pcs/carton (polyfoam + 5 layers corrugated carton) |
El tiempo de entrega: | 15-25 days after receiving deposit |
Capacidad de suministro: | 10000 Unit per Month |
Tipo de pago: | Money Gram, L/C, T/T |
Grupo de productos : | Drawer filing cabinet |