FOB Price
Obtener el precio más reciente|
Minimum Order
Place of Origin:
-
Price for Minimum Order:
-
Minimum Order Quantity:
1 Ton
Packaging Detail:
in rolls
Delivery Time:
10 days
Supplying Ability:
800 Ton per Month
Payment Type:
T/T, L/C
Material: | Sizes: | Tolerance (mm): |
Tensile
strength: N/mm2 |
Elongation (Min): | Zinc coating g/m2: | Elec. Resistance (Max.ohm/km) : |
Coil
ID (mm): |
Coil
Wt .(kgs): |
Galvanized steel wire for cable armoring | 0.*7mm | +/*0.**5 | ******0 | Min.*2% | Min.**0 | Max.**3 | ******0 | ******0 |
1.*1mm | +/*0.**5 | ******0 | *2% | **0 | **0 | ******0 | ******0 | |
1.*4mm | +/*0.**5 | ******0 | *2% | **5 | *4.*3 | ******0 | ******0 | |
1.*4mm | +/*0.*5 | ******0 | *2% | **5 | *6.*1 | ******0 | ******0 | |
2.*3mm | +/*0.**5 | ******0 | *2% | **0 | *9.*7 | ******0 | ******0 | |
3.*5mm | +/*0.*7 | ******0 | *2% | **5 | *8.9 | ******0 | ******0 | |
3.*0mm | +/*0.**5 | ******0 | *2% | **5 | *2.*8 | ******0 | ******0 |