¿Aún no es miembro de TradeKey.com? Regístrese para conectarse con 9 millones de importadores y exportadores a nivel mundial. registro |
BOOK A CALL
Book Call On Your Favorite Time
Code
🗘

By Signing Up. I agree to TradeKey.com Terms of Use, Privacy Policy, IPR and receive emails related to our services

Contact Us
Economical PU sandwich panel roll forming line

Economical PU sandwich panel roll forming line

150000 ~ 250000 / Set ( Negotiable )

|

Minimum Order

Place of Origin:

China

Price for Minimum Order:

Minimum Order Quantity:

1 Set

Packaging Detail:

common shipping packing

Delivery Time:

150~180 days

Supplying Ability:

2 Set per Year

Payment Type:

T/T

Contactar ahora
Miembro Básico

Persona de contacto Mr. Jonson

Jinshui Avenue, Xinxiang, Henan

Contactar ahora

Description

This kind of line is economical model PU composite panel (sandwich panel) line. Each machine component is portable and it is easy to operator. Maybe some parts looks simple, but the suitable working function can be finished well. Although complete line components are not advanced and complex, the final panel quality is perfect.
Main components of line:
Two decoilers for up and down forming layer. (Each forming layer has one decoiler)
Raw material sheet transmission frame and rolls
Up layer forming machine (1 unit)
Down layer forming machine (1 or 2 units, according to final customer requirements)
Pre-heat device
Gluing device
Double belt device
Saw cutting device
Long length final panel support frame and rolls
PLC control system
Hydraulic system
Foaming device (simple model)
 
Mini order quantity: 1 set
   Common delivery time: **0~**0 days
   Payment item: *0% contract price is paid to seller when the contract is signed by both parts as down payment; *0% contract price is paid to seller by T/T before the shipment. Installation charge is to be paid before installation by T/T.
Installation and test: if the final customer requires the installation and test job in his factory location, the final customer should pay the installation charges (USD *0 one man one day). The final customer pays the sellers technicians travel cost outside China, including round air tickets fee, accommodation and food, provide transportation from living hotel to the work place, necessary communication, and insurance, etc.
                  Normally, the installation time is about *0 days, and the test time is about *0 days.

Send a direct inquiry to this supplier

A:

Mr. Jonson < Xinxiang Ever Great Machinery Manufacture Co, Ltd >

quiero saber: