FOB Price
Obtener el precio más reciente2800 / Set
|Minimum Order
Place of Origin:
-
Price for Minimum Order:
Minimum Order Quantity:
1 Set
Packaging Detail:
Standard Packaging- Plywood box
Delivery Time:
10 working days
Supplying Ability:
1000 Set per Month
Payment Type:
T/T, L/C, Western Union, PayPal
Persona de contacto Mr. Godwin
Ji'nan City, Shandong province Jibei Development Zone, Jinan, Shandong
Parameters | |
Model | HTVL |
Capacity | **0kg |
Platform size | ***0MM* **0MM (Can be customized) |
Lifting height | ***0mm |
Dimensions | ***0****0****0mm |
Drive mode | Hydraulic |
Configuration | Open through or front and side entrances |
Speed | 0.*6m/s |
Control voltage | *4V/DC |
Power Output | 2.2KW/**0V or as your local voltage |
Power Input | **0v/*0hz or as your local voltage |
Control Mode | Inching Switch or Automatic |
Drive Control | Self-resetting system |
Material of Platform | Checkered slip-proof steel plate ,surface stainless steel |
Painting | Stainless steel |
Operation Panel | Polished aluminum alloy |
Safety Wane Working Range | *5° |
Working Condition | Both indoors and outdoors |
Working temperature | From **0°~ *0°C | ||||||||||||||||||||||||||||||||||||
Installation | Non-pit installation, directly fixed to concrete floor(the concrete floor below the platform shall not be lower than the ground) | ||||||||||||||||||||||||||||||||||||
Control Device |
Calling box
(installed on the wall nearby) and remote controller(Extra optional) |
||||||||||||||||||||||||||||||||||||
Emergency Stop |
The lifting and
lowering process can be stopped immediately by pressing the emergency button. |
||||||||||||||||||||||||||||||||||||
Prices are determined by the heights of the
lift and the type of material used. ELECTROSTATIC SPRAY/ PAINT: HTVL****1, Height*1m = USD ***0 (FOB Price) HTVL****1.5, Height*1.5m = USD ***4 (FOB Price) HTVL****2, Height- 2 = USD ***0 (FOB Price) HTVL****2.5 Height- 2.5 =USD ***0 (FOB Price) HTVL****3 Height- 3 =USD ***0 (FOB Price) STAINLESS STEEL: HTVL****1, Height*1m = USD ***2 HTVL****1.5, Height*1.5m = USD ***8 HTVL****2, Height- 2 = USD ***8 HTVL****2.5 Height- 2.5 = USD ***0 HTVL****3 Height- 3 = USD ***2 Safety devices |
|||||||||||||||||||||||||||||||||||||
1. Payment: T/T. *0% of total contract value as down payment, *0% of contract balance should be paid before shipping . 2. Delivery time: *0 working days after receive of payment. 3. Packing: Standard Package. 4. Warranty: **-month apart from man-made fault 5. Documents with shipment: installation guide, maintenance guide, operation manual, electric diagram, hydraulic diagram, quick-wear part, etc. (all in English)
|