FOB Price
Obtener el precio más reciente419 ~ 519 / Ton ( Negotiable )
|Minimum Order
Place of Origin:
Hebei, China (Mainland)
Price for Minimum Order:
Minimum Order Quantity:
25 Ton
Packaging Detail:
Packag by bundles with 2-3mt or as customer's requirements
Delivery Time:
10-25days after receiving the deposit
Supplying Ability:
100000 Ton per Month
Payment Type:
T/T, L/C, Western Union, Money Gram
Persona de contacto Ms. Lynn
Huai'n road, Shijiazhuang, Hebei
Diameter |
6mm**0mm (as per customers\' requirement) 6,8,*0,*2,*4,*6,*0,*5,*2,*0,*0mm |
Length |
***2m as standard 6,9,*2m |
Packing |
standard export packing, or as per customers\' requirement |
Surface Finished |
Screw-thread Epoxy coating Galvanized coating |
Technology |
Hot rolled Cold rolled |
Delivery time |
within *0 days after received the deposite or L/C at sight |
Payment |
1).**0% irrevocable L/C at sight. 2).*0% T/T prepaid and the balance against the copy of B/L |
Application |
Construction, shipping, building material |