FOB Price
Obtener el precio más reciente( Negotiable )
|Minimum Order
Place of Origin:
-
Price for Minimum Order:
-
Minimum Order Quantity:
1 Set
Packaging Detail:
carton+wooden pallet
Delivery Time:
15days after getting deposit
Supplying Ability:
100 Set per Day
Payment Type:
Other, Western Union, T/T
Persona de contacto Ms. Julia
No.88 Shantong Road, Shangyang Town, Jinshan District
â— | Implement ISO13256 standards meet the international requirements | ||||||||||
â— | Adopt groundwater, soil as heat exchang source, more energy saving and environmental protection | ||||||||||
â— | Adopt the latest environmentally friendly refrigerants, in line with the European environmental protection standards | ||||||||||
â— | Many kinds of power supply system as options | ||||||||||
â— | Enforce household Metering and Charging | ||||||||||
â— | No need room, free to increase/decrease unit | ||||||||||
â— | Adopt two stage shock absorber + double-deck static plenum box design, low noise running | ||||||||||
â— | Optional water valve, reducing the cooling water, ensuring the stable running and reducing the failure rate | ||||||||||
â— | Optional LCD controller, thermostat, remote controller | ||||||||||