¿Aún no es miembro de TradeKey.com? Regístrese para conectarse con 9 millones de importadores y exportadores a nivel mundial. registro |
BOOK A CALL
Book Call On Your Favorite Time
Code
🗘

By Signing Up. I agree to TradeKey.com Terms of Use, Privacy Policy, IPR and receive emails related to our services

Contact Us
hard Coal for power Plant

hard Coal for power Plant

55 ~ 65 / Ton ( Negotiable )

|

Minimum Order

Place of Origin:

-

Price for Minimum Order:

Minimum Order Quantity:

5000 Ton

Packaging Detail:

bulk,

Delivery Time:

7 Day after Order

Supplying Ability:

20000 Ton per Month

Payment Type:

L/C

Contactar ahora

MB GERMEDINAS

Lithuania

Miembro Básico

Persona de contacto Mr. Siegfried

Å iauliai, Siauliai

Contactar ahora

Description

Quality / analysis of the hard coal:

- ash in the dry state *5.4%
- initial ash *2.3%
- volatile substances in the dry state *1.4%
- initial volatile substances *0.0%
- calorific value in dry condition 4.**5 kcal / kg
- initial caloric value 3,**2 kcal / kg
- low calorific value in dry state 3,**1 kcal / kg
- initial low calorific value 3,**9 kcal / kg
- Sulfur content in the dry state 0.*1%
- initial sulfur content 0.*8%

Send a direct inquiry to this supplier

A:

Mr. Siegfried < MB GERMEDINAS >

quiero saber: