¿Aún no es miembro de TradeKey.com? Regístrese para conectarse con 9 millones de importadores y exportadores a nivel mundial. registro |
BOOK A CALL
Book Call On Your Favorite Time

By Signing Up. I agree to TradeKey.com Terms of Use, Privacy Policy, IPR and receive emails related to our services

Contact Us
Manufacturer Directory Aluminum Constructionconcrete Plank

Manufacturer Directory Aluminum Constructionconcrete Plank

700 ~ 800 / Ton ( Negotiable )

|

Minimum Order

Place of Origin:

-

Price for Minimum Order:

Minimum Order Quantity:

1 Set

Packaging Detail:

BULK PACKING THEN PALLET PACKED

Delivery Time:

30DAYS AFTER PAYMENT

Supplying Ability:

200 Ton per Month

Payment Type:

T/T, L/C, D/A, D/P, Western Union, PayPal

Contactar ahora
Miembro Básico

Persona de contacto Ms. zhu

wuyun road, Wuxi, Jiangsu

Contactar ahora

Description

steel plank can replace timber or bamboo plank, construction workers can walk on that.There are many different sizes and materials of the steel plank, we can make that products according to the customer's requirements

 

1) A larger capacity

When the scaffolding geometry and structure is compliant with the relevant requirements, the general single-tube column scaffold bears capacity of up to *5kN ~ *5kN (1.5tf ~ 3.5tf, design value).

 

2) Easy disassembly, erection and flexible

Easy to adjust the length of the tube, fastener connection is simple, and thus can adapt to all kinds of plane, elevation of buildings and structures with the scaffold.

 

3) To compare the economy

Processing is simple, a relatively low investment costs; if well-designed scaffolding geometry, focus on improving working capital utilization rate of steel, the material consumption can be achieved better economic results. Fastening steel frame construction steel per square meter equivalent to about *5 kg.

 

 

 

Send a direct inquiry to this supplier

A:

Ms. zhu < WUXI HANJIE TRADE CO., LTD >

quiero saber: