¿Aún no es miembro de TradeKey.com? Regístrese para conectarse con 9 millones de importadores y exportadores a nivel mundial.
registro |
BOOK A CALL
Book Call On Your Favorite Time
Code
🗘

By Signing Up. I agree to TradeKey.com Terms of Use, Privacy Policy, IPR and receive emails related to our services

Contact Us
Mazut M100-75 per GOST 10585 Standards

Mazut M100-75 per GOST 10585 Standards

( Negotiable )

|

Minimum Order

Place of Origin:

-

Price for Minimum Order:

-

Minimum Order Quantity:

50000 Metric Ton

Packaging Detail:

vessel

Delivery Time:

by vessel

Supplying Ability:

300000 Metric Ton per Month

Payment Type:

Other

Contactar ahora
Miembro Básico

Persona de contacto Mr. Christoffer

Strandgatan 8, Ronneby, Blekinge

Contactar ahora

Description

Procedures for Transaction (Bank to Bank):
IF YOU ARE INTERESTED - CONTACT US.
Only serious pls.
 

  1. Buyer issues LOI + CP for due diligence review to Seller.  If satisfactory, the Seller issues the formal offer with a SCO addressed to the Buyer.
  2. The Buyer issues an ICPO with full banking coordinates addressed to the End-Seller along with a copy of the Buyers company profile. 
  3. Seller issues DRAFT CONTRACT.  Buyer and seller sign and seal the contract. Although reasonable changes can be made within the Draft Contract, THE PAYMENT METHOD & INSTRUMENT: SBLC or BG via MT**0, IRDLC via MT**0 or MT**3 Conditional are NEITHER NEGOTIABLE nor IS THE VERBIAGE ALTERABLE.  
  4. Upon the signature of the DRAFT CONTRACT.  The Seller sends to the buyer the product information to check and test. The seller provides documents, including the Dip Test Report, sent via Swift to the buyers bank, with copy to the buyers secured email.              
  5. Seller issues the following documents: 
                        - Legalized and Registered FINAL CONTRACT AND INVOICE with refinerys reference number. 
                Seller issues below listed Notarized Partial (PPOP) to the Buyer:
(a) Certificate of Origin of the Product
(b) Company Registration
(c) Product Availability
(d) Export License
(e) Commitment to produce the Product
(f) Attestation of Allocation Certificate
(g) Analytical Test Report (Quality & Quantity)
                (h) Plus all the documents that may be required by Buyer 
  1. Once the buyer has received all the documents, the Buyer has maximum of one banking day to verify the product and all the documents (Including the DIP test report) and immediately posts their non-operative, non-transferable IRDLC via MT**0, or their SBLC or BG via MT**0.
  2. After confirmation of the Buyers payment instrument, Seller will issue to Buyers Bank the Full shipping documents, Proof of Product (POP) Plus 2% Performance Bond via Swift Bank to Bank upon acceptance of Buyers payment instrument (IRDLC /MT**0 Non Transferable) covering the first Trial Shipment by Seller to activate the Buyers Financial Instrument.
  3. After the dip test at the arrival report, the Buyer issues payment immediately via MT**3/TT to the Sellers nominated bank account. The product is then allowed to be unloaded and Title must be transferred to Buyer name.   Seller is responsible for the cost of the SGS at the loading port, the Buyer is responsible for the cost of SGS at the arrival port.
  4. Within *4 hours of payment from the buyer, the Seller issues the commission payments to all intermediaries.
  5. Next shipment gets prepared
 
N.B.:  The supplier signs up to a hefty penalty fine guarantee, for non-performance. Like ALL CONTRACTS, both side give guarantees.  Seller issues a performance bond for *0% for JP*4 and 2% for D2, D6, EN**0, Mazut, LNG and LPG of the value of the contract.  Buyer Swifts via MT**0, a BG or SBLC or MT**3 or IRDLC via MT**0 in the amount of 1 month shipment.  Revolving for *2 months and one day.  No loading, no departure of ship until MT**3 or IRDLC payment instrument is activated. 
 
* ICPO is required for Mazut, D2, LNG and LPG requests.                                      
** Banking must be from a Top *5 bank.                                           
*** Requests for partial PPOP before step â„– 3 will be denied.
**** L/C, DLC are not accepted.
Note:  Prices, Terms and conditions subject to change by refinery sources.
 

Send a direct inquiry to this supplier

A:

Mr. Christoffer < LAGUN EUROPE, >

quiero saber: