¿Aún no es miembro de TradeKey.com? Regístrese para conectarse con 9 millones de importadores y exportadores a nivel mundial.
registro |
BOOK A CALL
Book Call On Your Favorite Time
Code
🗘

By Signing Up. I agree to TradeKey.com Terms of Use, Privacy Policy, IPR and receive emails related to our services

Contact Us
Hot Sale in Pakistan Unique Design Street motorcycle 48cc 70cc 90cc 110cc motorcycle

Hot Sale in Pakistan Unique Design Street motorcycle 48cc 70cc 90cc 110cc motorcycle

268 ~ 320 / Unit

|

Minimum Order

Place of Origin:

-

Price for Minimum Order:

Minimum Order Quantity:

50 Unit

Packaging Detail:

Seaworthy package

Delivery Time:

Within 35 days after deposit

Supplying Ability:

2000 Unit per Month

Payment Type:

L/C, T/T

Contactar ahora
Miembro Básico

Persona de contacto Ms. Ivy

Longshan Road, Yubei District, Chongqing, Chongqing

Contactar ahora

Description

The cheapest motorcycle with best quality!

*8cc *0cc *0cc **0cc Street legal motorcycle HY*****1

EEC Approved

 

 Specification of street legal motorcycle HY*****1:

Model: HY*****1
SPECIFICATION
Dimension(mm) ***0X**0X***0
Wheel Base(mm) ***0
Min.Ground Clearance(mm) **0
Max.Speed(km/h) *5
Max. Loading(kg) **0KG
Engine type Air cooled, 1 cylinder, 4 stroke
Displacement(ml) **0
Max Power(km/min) 5.5/***0
Max Torque(r/min) 8.0/***0
Tyre Size(Fr./Rr) 2.****7/2.***7
Economic Fuel Consumption/**0km 2.2
MOQ(Loading Qty)*0HQ **6units/*0HQ

 

Features of street legal motorcycle HY*****1:

>*8cc, *0cc, *0cc **0cc optional

>Unique outlook style

>Really factory price, low and most competitive

>Highest cost-effective

>Multi options, could be customized as your requirement
 

FAQ:

1. Q: Is HARAY a trading company or manufacture? 
    A: HARAYs trading offices are located in Guangzhou and Chongqing while the factory is located in Chongqing. We have manufactured motorcycles for *5 years, and began the export business 6 years ago.

 

2. Q: Do you have the products in stock?

A: No. All motorcycle are to be produced according to your order including samples.

 

3. Q: Whats the delivery time?

    A: It usually takes about *5 working days to produce an order from MOQ to *0HQ container. But the exact delivery time might be different for different orders or at different time.

 

4. Q: Can I mix different models in one container?

    A: Yes, different models can be mixed in one container, but the quantity of each model should not be less than MOQ.

 

5. Q: How does your factory do regarding quality control? 
    A: Quality is priority. HARAY People always attach great importance to quality control from the very beginning to the end of the production.  Every product will be fully assembled and carefully tested before it\'s packed for shipment.

 

6. Q:What\'s your warranty terms? 
    A:We offer different warranty time for different products (at least one year). Please contact with us for detailed warranty terms.

 

7. Q: Will you deliver the right goods as ordered? How can I trust you?

    A: Yes, we will. The core of our company culture is honesty and credit. HARAY has been alibabas Gold supplier since ***0. If you check with alibaba, you will find excellent trading record.

 

To meet your needs is our target.Call me, let\'s talk for more details!

***6 **9 ***6 *****-Ivy

Send a direct inquiry to this supplier

A:

Ms. Ivy < Chongqing Haray International Business Co., Ltd. >

quiero saber: