Description
The device is composed of shell and tube
system, the upper shell inside set steam condensation section, set
the hydrophobic water cooling at the bottom, the top of the inlet
and outlet pipe set feed water inlet and outlet. When super-heated
steam get into the shell by inlet, the feed water of upper main
spiral tube can be heated, after the steam condenses into water,
part of the feed water of the lower hydrophobic cold spiral tube
can be heated by the hot water of condensation.
After being used the condensate was drained out by the hydrophobic
export. This device has low energy consumption, compact structure,
less occupied area, material consumption saving etc, can control of
hydrophobic water velocity more strictly and narrow hydrophobic
terminal difference.
System and product design
The steam turbine of **0 MW and below auxiliary machine supporting
design, cooling area range from **0 ㎡ to ****0 ㎡;
Performing ASME, HEI, TEMA etc. home and abroad design
standard;
Material include carbon steel, low alloy steel, high alloy steel,
titanium, copper, composite materials, etc.;
Condenser design using 3 d simulation and advanced technologies
such as steam flow field distribution CFD optimization; System
design using the process simulation technology and structure stress
analysis technology;
Condensation water level adjusting control system design;
Cooling pipe specification: outside diameter *6 mm to *0 mm, wall
0.5 mm to 1.5 mm; Can meet the process requirements of different
users.
Service mode
Complete range of condensate system design and supply, to provide
users with a full set of systems and equipment solutions;
According to user's actual situation to provide system design;
To provide related project approachment and technical reform
services of condensate system and equipment;
To help users understand the latest information at home and abroad,
have certain foresight;
To develop strict time nodes, timely to provide customers with
technical data and the progress of the design, manufacture, and
arrange for users to visit our factory on time;
In construction process, send experienced field service personnel
according to user requirements to guide the installation,
commissioning, processing for the supplied equipment in the process
of installation and debugging for a variety of technical quality
problems;
After the construction completed and put into service, provide free
technical advice and guidance.
Patent application
The new type tube shell form heat exchanger, ZL***********0.6;
A kind of heat exchanger with suction device, ZL***********6.8;
Heat exchanger with vapour barrier, ZL***********6.4.
Â