¿Aún no es miembro de TradeKey.com? Regístrese para conectarse con 9 millones de importadores y exportadores a nivel mundial. registro |
BOOK A CALL
Book Call On Your Favorite Time
Code
🗘

By Signing Up. I agree to TradeKey.com Terms of Use, Privacy Policy, IPR and receive emails related to our services

Contact Us
plastic Racetrack  /  plastic Running track

plastic Racetrack / plastic Running track

10 ~ 20 / Square Meter ( Negotiable )

|

Minimum Order

Place of Origin:

-

Price for Minimum Order:

Minimum Order Quantity:

500 Square Meter

Packaging Detail:

Woven bag, Steel barrel

Delivery Time:

5~10 days

Supplying Ability:

-

Payment Type:

T/T, L/C, Western Union

Contactar ahora
Miembro Básico

Persona de contacto Mr. Alex

No.52 Harbin Road, Qingdao, Shandong

Contactar ahora

Description

.
Running Track / Athletic Track
image
SPRAY COAT running track
 
Construction process:  1st, use paver machine to flat rubber & PU glue mixture, then get the BASE LAYER; 2nd, use spraying machine to spread EPDM granule & PU mixture on to base layer, this is called FACE LAYER.   
 
SPRAY COAT model is good cost.
 
SANDWICH running track
 
Construction process:  1st, use paver machine to flat rubber & PU glue mixture, then get the BASE LAYER; 2nd, pour PU & EPDM granule mixture onto base layer, the mixture is mainly PU glue..
 
SANDWICH model is mainly used in club and other business fields.
 
FULL POUR running track
 
Construction process:  1st, pour PU glue & EPDM granule onto basement directly.  The mixture is mainly PU glue.
 
FULL POUR model is the highest level choice, it is mainly used for professional fields.

image


image

Send a direct inquiry to this supplier

A:

Mr. Alex < SinoFlooring Company Limited >

quiero saber: