¿Aún no es miembro de TradeKey.com? Regístrese para conectarse con 9 millones de importadores y exportadores a nivel mundial. registro |
BOOK A CALL
Book Call On Your Favorite Time
Code
🗘

By Signing Up. I agree to TradeKey.com Terms of Use, Privacy Policy, IPR and receive emails related to our services

Contact Us
COUPLER SHAFT BALANCER PART

COUPLER SHAFT BALANCER PART

2 ~ 8 / Acre

|

Minimum Order

Place of Origin:

-

Price for Minimum Order:

Minimum Order Quantity:

10000 Kilogram

Packaging Detail:

Bigbag, wooden box

Delivery Time:

5-7 days

Supplying Ability:

60000 Kilogram per Month

Payment Type:

T/T, L/C

Contactar ahora
Miembro Básico

Persona de contacto Mr. Kadir

T.Ziyaeddin Cd.No:31, Konya, Konya

Contactar ahora

Description

 
Manufacturing Schedule;
 
Our typical manufacturing schedule starts with the recieving order from our customers. According to the order ,it requires to prepare the raw materials such as pig iron,scrap steel etc. And also requires manufactured materials such as cores.
So pattern and core boxes which has been sent from our customers are prepped for the production.
Core room starts working first, and gets cores ready for molds which are being made.Meanwhile mold halves ( upper and lower ) are made and placed to the assembly area.At the assembly area, molds are flow coated and cores are set in place. The mold is then closed up for pouring.
After molds are staged on line,melted raw materials with our electircal induction furnace brougth to the molds and pouring process starts. Once poured, the molds are allowed to cool before next being sent to the shakeout. At the shakeout, the castings are separated from the sand mold. The sand is sent to a reclamation system so that it can be reused in the molding process.After shakeout is done,castings are sent to the cleaning room where they are prepared for costumers specifications. Processing in the cleaning room includes shot blasting, cut-off, welding, heat treating and inspection.
 



 

Send a direct inquiry to this supplier

A:

Mr. Kadir < Omeroglu Metallurgy Co.Ltd. >

quiero saber: