¿Aún no es miembro de TradeKey.com? Regístrese para conectarse con 9 millones de importadores y exportadores a nivel mundial.
registro |
BOOK A CALL
Book Call On Your Favorite Time

By Signing Up. I agree to TradeKey.com Terms of Use, Privacy Policy, IPR and receive emails related to our services

Contact Us
Ston Jaw Crash Mechin Price In Pakistan

Ston Jaw Crash Mechin Price In Pakistan

1000 ~ 10000 / Set

|

Minimum Order

Place of Origin:

-

Price for Minimum Order:

Minimum Order Quantity:

1 Set

Packaging Detail:

Standard container

Delivery Time:

25days

Supplying Ability:

100 Set per Month

Payment Type:

T/T, L/C

Contactar ahora
Miembro Básico

Persona de contacto caram

Kexue Revenue, Zhengzhou, Henan

Contactar ahora

Description

Jaw crushers are endowed with particular design structure, advanced technology and high cost performance. They are applicable to mining, metallurgy, making building materials and the construction of roads, railway, water conservancy project, etc. Primary and medium levels crushing are the best. Jaw crushers have been highly acclaimed due to their stable performance, safe and reliable feature, practical uses, economical and energy-saving virtues. Its humanized design achieves the propose to protect the environment. Owning to its super colossal crushing cavity, it has a large production and powerful crushing force when processing aggregated stones.

At now, the user often adopt High Manganese Steel Jaw Crusher/Ston Jaw Crash Mechin Price In Pakistan to crush the high hardness material. Because the vibrating is big in the processing of production.Devices are usually installed on the basis of reinforced concrete structure, but when the equipment running for a period of time. Under the frame of the surface of the concrete foundation often appear crack, loose. Cause equipment vibration. Seriously affect the equipment safety operation production by adopting reasonable concrete foundation and the proper installation method. It can avoid this situation.

A rubber plate should be ready. 8 mpa ~ *0 mpa tensile strength, elongation at failure **0% shear modulus of 2 mpa. The thickness of *0 mm or so, according to the usual practice that the pouring reinforced concrete foundation and obligate secondary water in secondary grouting layer location are installed on the steel mesh. Height *0 mm, the steel bar diameter of 8 mm (sure) according to the load, in order to strengthen the tensile strength of the secondary grouting layer, prevent secondary grouting layer rupture, and pouring height **0 mm or so of concrete, concrete pouring, immediate pressure on the concrete. The body base using the body weight of the secondary concrete laminated to **0 mm thick, adjust the level and the pituitary body position,. Use pillar to fix the body position. After concrete setting, will the body jacking. From the base of secondary grouting layer of about *0 mm, insert the rubber plate prepared between secondary grouting layer and base body. After good rubber mat plate. Slowly will balance pressure equipment on the rubber plate. After adjusting the body horizontal vertical position, we should fixed all the anchor bolt.

As the main force of crushing and screening equipment in the mining machinery field, Henan Fote Heavy Machinery Co., Ltd.leading the China stone crusher manufacturer has experienced the introduction of digestion and absorption of foreign advanced technology, which are combined of design manufacture, independent design development path for coal, metal and nonmetal mines developed to provide more international advanced level of high quality, efficient China crusher equipment. Welcome to visit and order.

Contact Infomation

ftmmining.com

Address: High and New Industrial Zone, Kexue Revenue, High and New Technology Industrial Development Zone, Zhengzhou, China

Send a direct inquiry to this supplier

A:

caram < Henan Fote Heavy Machinery Co., Ltd. >

quiero saber: