FOB Price
Obtener el precio más reciente3000 ~ 10000 / Ton ( Negotiable )
|Minimum Order
Place of Origin:
-
Price for Minimum Order:
Minimum Order Quantity:
1 Piece
Packaging Detail:
Fumigated Wood Pallet
Delivery Time:
60 Days
Supplying Ability:
5000 Piece per Year
Payment Type:
T/T, L/C
Persona de contacto Mr. Charles
No.63 Haier Road, Qingdao, Shandong
Detailed Product Description
DN**0mm****8mm Seamless Seel Tube-Stainless Steel Pipe Used for Ultra Supercritical Power Station Boiler
Specifications:
Description |
Used for Ultra Supercritical Power Station Boiler |
Material |
Stainless steel (**4L, **0S, **6L, **1 etc) |
Material Standard |
ASTM, ASME, DIN, JIS, ISO, BS, API, EN |
Dimension |
DN**0mm****8mm |
Smelting Process:EAF+LF+VD/VOD+VC
MPP: Smelting→Inspection→Ingot→Inspection→Heating→Forging→Inspection→Rough Machining→
     Inspection→HeatTreatment→Inspection→Semi-Final-Machining →Final Machining
     →Inspection→Blasting→Inspection →Painting →Inspection→Packing
Technics:Forging Ratio>3.5, Strictly In Accordance With EN******3; ASME**8;DIN;JIS
Equipments & Processing Capacity:
Smelting |
**0T EAF;**0T VD/VOD;*0T ESR;**0T Ladle Casting Cart;**0T VC. Annual Output 1 Million Tons. |
Forging |
**0MN Forging Press;W6*L*8*H5M Heating Furnaces;W5*L*5*H4M Heat Treatment Furnaces; ø2.6**0M Vertical Furnaces;*0MN Straightening Machine. Max **0T Ingot Can Be Forged.Annual Forging Capacity **0 Thousand Tons. |
Machining |
L:*0*D3.6M Deep Hole Drilling&Boring Machine;**0T,D8*H5M Vertical Lathe; D4*L*5M/*5M,**0T Horizontal Lathe;**0T,L*7.5*W5.8*H5M Milling&Boring Machine; D3M,**0T Grinding Machine. Turbine Shaft Processing Capacity:***0pcs/Year   |
Inspection:Approved By CNAS. Advanced Inspection Equipments Including GE SM*5XS UT Machine;Â
         Swiss ARL ***0 Spectrum; America AXIO Zeiss Microscope; ONH***0 Analyzer;
         CMT***5 Digital Testing Machine; ZBC***2C Impact Testin Machine, ICP***0
         Spectrometer lcp, ONH***0 Analyzer,CMM, etc.Â