¿Aún no es miembro de TradeKey.com? Regístrese para conectarse con 9 millones de importadores y exportadores a nivel mundial.
registro |
BOOK A CALL
Book Call On Your Favorite Time
Code
🗘

By Signing Up. I agree to TradeKey.com Terms of Use, Privacy Policy, IPR and receive emails related to our services

Contact Us
Anti-Collision System of Tower Crane (SYS6000A/6000E)

Anti-Collision System of Tower Crane (SYS6000A/6000E)

22222 ~ 55555 / Set ( Negotiable )

|

Minimum Order

Place of Origin:

China

Price for Minimum Order:

Minimum Order Quantity:

1 Set

Packaging Detail:

carton box with inner liner

Delivery Time:

3 days

Supplying Ability:

30 Set per Month

Payment Type:

T/T, L/C

Contactar ahora
Miembro Básico

Persona de contacto Nicole

industrial park, Jinan, Shandong

Contactar ahora

Description

Anti-collision system of tower crane is the anti-collision safety monitoring system that used in complicated construction environment when tower crane groups work together closely. Main processing unit of every tower crane process own condition (such as slewing angle, amplitude position) in real time, meanwhile it forms a information network of related tower cranes (max. *0 sets) under the same construction environment by wireless transmission module.

The status information of every tower crane can transmit among tower cranes by information network. Main control of every tower crane proceed anti-collision calculation according to detected information of native crane and other tower cranes, then proceed alarm or cut off corresponding control circuit on the basis of the results.

Product function:

It shows current work parameters and rated work parameters of tower cranes in real time, so that the driver can know the work condition of tower cranes directly.
It collects trolleying range, slewing angle precisely in real time, comparing current data with fixed data and cutting off the corresponding control circuit, and emitting the sound- light warning when it exceeds the range.
Non-contact measurement technology, high positioning measurement precision, extend using life of system, make the system work precisely.
Powerful and advanced operating function, easy and prompt present erection, can finish erecting the system in cab.

Can control at least *0 sets of tower cranes work together, and never crash each other.
Every tower crane can set up their own limited areas.
In telecommunication network of tower crane group, anyone can enter or exit optionally, operate easily.
Static parameter of tower cranes in system can be set, monitored and revised by main controlling monitor on the ground, don't need operators to climb up the tower cranes to deal. In addition, it can also be equipped with PC monitoring system according to customers' requirements.

Send a direct inquiry to this supplier

A:

Nicole < Shandong Minglong Construction Machinery Co., Ltd >

quiero saber: