FOB Price
Obtener el precio más reciente( Negotiable )
|Minimum Order
Place of Origin:
China
Price for Minimum Order:
-
Minimum Order Quantity:
2 Piece
Packaging Detail:
wooden case
Delivery Time:
1 week
Supplying Ability:
5200 Piece per Month
Payment Type:
T/T, L/C
Persona de contacto Ms. hellen
Rm 1016 Far-Euro Modern Building,No 2449.Gonghexin Road Shanghai P.R.China, Shanghai, Shanghai
miniature roller chain
roller chain manufacturers
Athe main chain have the same maximum allowable load
(M-type connecting chain section increases and the transition from the double chain)
 M-type connecting chain and double chain from the transition of the largest rated load has been proven to meet the standard chain level,
it can be fully the performance of the chain to achieve a zero waste and more economic operation of the chain