FOB Price
Obtener el precio más reciente10 ~ 20 / Piece ( Negotiable )
|Minimum Order
Place of Origin:
Tianjin
Price for Minimum Order:
Minimum Order Quantity:
2000 Piece
Packaging Detail:
Standard export package
Delivery Time:
Within 20 days
Supplying Ability:
10000 Piece per Day
Payment Type:
T/T, L/C, D/P, Western Union
Persona de contacto Ms. Yamin
No.46 Renmin East Road, Changsha, Hunan
PRODUCT NAME:METAL PLANK
1) A larger capacity
When the scaffolding geometry and structure is compliant with the relevant requirements, the general single-tube column scaffold bears capacity of up to *5kN ~ *5kN (1.5tf ~ 3.5tf, design value).
2) Easy disassembly, erection and flexible
Easy to adjust the length of the tube, fastener connection is simple, and thus can adapt to all kinds of plane, elevation of buildings and structures with the scaffold.
3) To compare the economy
Processing is simple, a relatively low investment costs; if well-designed scaffolding geometry, focus on improving working capital utilization rate of steel, the material consumption can be achieved better economic results. Fastening steel frame construction steel per square meter equivalent to about *5 kg.
Size (mm) |
Weight (kg/pc) |
Size (mm) |
Weight (kg/pc) |
WALK BOARDS |
CATWALK |
||
**0 x *5 x 1.2 x ***0 |
*3.*0 |
**0 x *0 x 1.2 x ***9 |
*5.*0 |
**0 x *5 x 1.2 x ***0 |
*0.*6 |
**0 x *5 x 1.2 x ***9 |
*3.*0 |
**0 x *5 x 1.2 x ***0 |
6.*3 |
**0 x *5 x 1.2 x ***9 |
*3.*0 |
**0 x *5 x 1.2 x ***0 |
3.*9 |
**0 x *8 x 1.2 x ***9 |
*2.*0 |
**0 x *5 x 1.2 x ***0 |
*4.*7 |
**0 x *5 x 1.2 x ***9 |
*2.*0 |
**0 x *5 x 1.2 x ***0 |
*1.*3 |
**0 x *0 x 1.2 x ***9 |
*1.*0 |
**0 x *5 x 1.2 x ***0 |
7.*9 |
**0 x *5 x 1.2 x ***9 |
*0.*0 |
**0 x *5 x 1.2 x ***0 |
3.*4 |
**0 x *5 x 1.2 x ***9 |
9.*0 |
**0 x *0 x 1.2 x ***0 |
*5.*7 |
**0 x *8 x 1.2 x ***9 |
9.*0 |
**0 x *0 x 1.2 x ***0 |
*1.*4 |
**0 x *5 x 1.2 x ***9 |
9.*0 |
**0 x *0 x 1.2 x ***0 |
8.*0 |
**0 x *0 x 1.2 x ***9 |
*1.*0 |
**0 x *0 x 1.2 x ***0 |
4.*5 |
**0 x *0 x 1.2 x ***9 |
8.*0 |