FOB Price
Obtener el precio más reciente( Negotiable )
|Minimum Order
Place of Origin:
China
Price for Minimum Order:
-
Minimum Order Quantity:
-
Packaging Detail:
carton, pallet
Delivery Time:
30days
Supplying Ability:
-
Payment Type:
T/T, L/C
Persona de contacto Mr. Jesing
1311 #, Satellite Building, No. 63 Zhichun Road,HaiDian district, Beijing, Beijing
1.flexible mobile scaffolding.
2.mobile scaffolding with brakes.
3.for building decaration.
4.all-round mobile scaffold.
Details of   Mobile Scaffolding  With Brake
ÂÂ
Â1.Mobile scaffolding is easy to assemble and dismantle, cause its simple structure.
ÂÂ
Â2.Mobile scaffolding is suitable for inside & outside building when it's using with different  accessories.
ÂÂ
Â3.Mobile scaffolding are with brakes which can prevent the frame scaffolding from rolling or moving.
ÂÂ
Â4.When you dismantle caster wheels, and installing the frame scaffolding with u - head, jack base , then it is for