FOB Price
Obtener el precio más reciente35000 ~ 50000 / Set ( Negotiable )
|Minimum Order
Place of Origin:
Guangzhou, China
Price for Minimum Order:
Minimum Order Quantity:
1 Set
Packaging Detail:
Wooden Case
Delivery Time:
90-120 days
Supplying Ability:
1 Set per Month
Payment Type:
T/T, L/C
Persona de contacto Mr. Vic
Floor 10, building A, Billion Centre, No. 1 Wang Kwong Road, Kowloon Bay,Kowloon, HongKong, Other
Project | Â Specific Parameters | Â Note |
 Maximum production rate |  **0BPM |  Depends on the packing specification |
 Diameter of bottle cap |  Φ*0~φ*5mm |  If change the bottles, the related machine parts need to be changed |
 Height of  bottle cap |  *0~*0mm |  If change the bottles, the related machine parts need to be changed |
 Diameter of bottle |  φ*0~φ*8mm |  If change the bottles, the related machine parts need to be changed |
 Height of bottles |  *5~**0mm |  If change the bottles, the related machine parts need to be changed |
 Power supply |  AC**0V *0/*0HZ |  |
 Total Power |  1.*9KW |  |
 Atmospheric Pressure |  0.5~0.7Mpa |  |
 Air Consumption |  About *0L/min clean air |  |
 Dimensions |  About (L)×***0mm(W)×***0mm(H) |  |
 Weight |  About ***0kg |  |