¿Aún no es miembro de TradeKey.com? Regístrese para conectarse con 9 millones de importadores y exportadores a nivel mundial.
registro |
BOOK A CALL
Book Call On Your Favorite Time

By Signing Up. I agree to TradeKey.com Terms of Use, Privacy Policy, IPR and receive emails related to our services

Contact Us
Sell Building Hoist (SC200/200)

Sell Building Hoist (SC200/200)

44444 ~ 66666 / Set ( Negotiable )

|

Minimum Order

Place of Origin:

China

Price for Minimum Order:

Minimum Order Quantity:

1 Set

Packaging Detail:

Naked, via 40HC container

Delivery Time:

7 days

Supplying Ability:

15 Set per Month

Payment Type:

T/T, L/C

Contactar ahora
Miembro Básico

Persona de contacto Nicole

industrial park, Jinan, Shandong

Contactar ahora

Description

SC Hoist is a rack and pinion EL. Lift, used on construction site for transportation of personnel and materials. It is installed and dismounted conveniently and can grow as high as the building grow in height.
There're single cage and two cages hoists. A single cage can be quickly transformed into twin cages hoist by adding a cage and other parts. The hoist payload can be increased by adding counterweight equipment.
SC hoist has reliable electrical and mechanical safety device, it is efficient and safety vertical transporting equipment.

Steelwork of building hoist is shaped through semiautomatic gas-protection welding with high-quality steel.
The steelwork surface is processed with phosphating and finish baking treatment or hot galvanizing treatment according to customers' requirements.
The suspension cages can be decorated with steel wire mesh or perforated aluminum plate.

Parameters Unit Parameter
Max.   Load kg 2× ***0
Max.   Passengers   2× *0
Rated  Lifting  Speed m/min *4.4
Max.   Lifting  Height m **1
Max.   Free  End  Height  of  Guides m 7.5
Modulus                   8
Carriage  Weight kg ***2× 2
Size  of  Carriage m 3× 1.3× 2.3
Standard  Knot  Weight kg **6
Dimension  of  mast  section  m 0.*5× 0.*5× 1.**8
Motor Model   YZZ**2M*4
Rated  Power Kw 3× *1    three  engines
Rated  Rotate  Speed r/min ***0
Reducer Center  Distance mm **5
Ratio   1: *6
Over  speed  Governor Type progressive    type 
Model  
SAJ***1.2A  safety  device 
Operation  Speed m/min *1.6
Brake  Moment N. m ≥ ***0
Crane  Weight t *2
Packing ***0' HQ
Delivery  time ***5  days
Warranty  period One  year  after  the  equipment  be  installed  in  good  condition.
The  period  and  fees  of  the  warranty 1).   In  the  warranty  period,   the  seller  will  not  charge  for  replacing  the  broken  fittings  that  caused  by  the  quality  and  will  pay  for  the  mailing  fees  concerned.
2).   In  the  warranty  period,   the  seller  will  charge  cost  only  for  the  replacing  fittings  which  caused  reasons  of  users  not  keeping  products  in  good  condition  or  operated  not  in  the  correct  way.   The  mailing  and  related  fees  should  be  paid  by  the  buyer;
3).   When  the  warrant  period  is  expired,   the  seller  will  only  charge  for  cost  of  the  fittings  which  have  been  replaced.   And  the  mailing  and  related  fees  have  to  be  paid  by  the  buyer;
4).   No  matter  the  warranty  period  is  expired  or  not,   should  the  buyer  need  the  seller’ s  engineer  to  the  site  of  the  buyer  to  deal  with  the  trouble  of  the  equipment,   the  buyer  has  to  supply  an  interpreter  and  pay  for  the  fees  of  round  trip  ticket,   hotel  fees,   transportation  fees  and  pay  the  seller’ s  Engineer  *0  US  dollars  per  day  per  person;
Installation  and  Testing  of  equipment 1).   The  Seller  will  send    one    of  her  experienced  engineer  to  the  Buyer’ s  site  to  help  the  completed    installation  works  under  the  requirement  of  the  Buyer.
2).   The  Buyer  is  responsible  for  the  following:
A.   deal  with  the  visa  for  the  Seller’ s  engineer
pay  the  round  trip  air  ticket;   Boarding  and  lodging;
a  Chinese-English  interpreter;
The  transportation  fees  of  the  engineer  in  the  buyer’ s  country;
responsible  for  the  safety  of  the  engineer  in  the  buyer’ s  country;
Pay  the  engineer    USD*0    per  working  day  as  allowance;
3).   Preparation  work  on  the  site  should  be  done  well.   Should  the  reason  of  buyer  or  the  customer  that  caused  the  delay  of  installation,   they  have  to  bear  the  corresponded  fees.   The  buyer  has  to  fill  in  an  installation  contact  form  by  the  seller  and  fax  to  the  seller  to  ensure  the  preparation  work  is  well  done  Before  the  seller’ s  engineer    arriving  the  site  of  the  buyer,   Should  the  engineer    of  seller  arrived  the  site  of  buyer  but  preparation  work  not  done,   the  related  fees  should  be  paid  by  the  buyer;
4).   The  installation  period  can  be  arranged  by  the  seller  and  the  buyer.
 

Send a direct inquiry to this supplier

A:

Nicole < Shandong Minglong Construction Machinery Co., Ltd >

quiero saber: