FOB Price
Obtener el precio más reciente0.2 ~ 40 / Piece ( Negotiable )
|Minimum Order
Place of Origin:
China
Price for Minimum Order:
Minimum Order Quantity:
100 Piece
Packaging Detail:
Carton, Tray or as your request
Delivery Time:
30 days
Supplying Ability:
200000 Piece per Month
Payment Type:
L/C, T/T
Persona de contacto Mr. Jesing
1311 #, Satellite Building, No. 63 Zhichun Road,HaiDian district, Beijing, Beijing
- Article: Forging product
- Production process: Forging,
fabricating
- Heat treatment: annealing, normalizing, quenching,
tempering
- Material: Brass, Bronze, copper, carbon steel,
alloy steel, stainless steel, aluminum,
aluminum alloys, brass alloys,
mild steer, Brass
- Secondary operation: machine machining, polishing,
chrome plate,
powder costing, anodize oxidation
-
Lead time of the mould : *5days
- Brand Name: Oriens forging
*Note:
Custom manufactured according to customer's drawings
or samples