FOB Price
Obtener el precio más reciente1 ~ 2 / Set
|Minimum Order
Place of Origin:
China
Price for Minimum Order:
Minimum Order Quantity:
1 Set
Packaging Detail:
Carton
Delivery Time:
one month
Supplying Ability:
5 Set per Month
Payment Type:
L/C, T/T
Persona de contacto Ms. Vicky
No 6 Jinsha Road, Shijiazhuang, Hebei
Nowadays, the paper faced gypsum board production line is the professional
equipment for producing the new decorated material. The principal working
process are as follows: first, we take certain amount of hemihydrate gypsum
powder, water and other additives, through the automatic measurement
device and automatic conveying system, they will be conveyed into the mixer
and changed into the gypsum slurry which will be scattered on continuous
moving faced paper evenly. Second, at the same time, with the continuous
moving and vibrating, the slurry will gradually diffuse and even scattered.
Then the slurry will go into the forming machine and compound with the
top and bottom faced paper. By the process of extruding and forming, the
slurry will be encased by the faced paper and the continuous pulpous
gypsum boards are formed. Third, In the forming line, the wet solid paper
faced gypsum board will be gradually formed after the process of recondition,
natural coagulating, automatic cutting, etc. The wet board will be arranged
according to the programmed control system. With the help of rollers,
belt conveyer and overturner, they will quickly enter into the dryer. Fourth,
the board will be strictly controlled in the separate temperature zone of the
dryer. After blowing into different thermal hot air, the moisture of the wet board
will be evaporated. Because of the reaction of the starch, the board will be
attached to the faced paper, and then the dry gypsum board will form and
exit from the dryer. Moreover, after passing though overtuner and the folding
device (the front side is inside) for the second time, the board will be cut into
certain specification by saw. Finally, the finished gypsum board will be conveyed
to the automatic sealing device and the stacker. After the stacking, the board will be
transported to the finished products warehouse by the forklift.