Description
Projects
standards:
projects
|
standards
|
Colour and appearance of the film
|
Steel gray,smooth
|
Drying time
|
Drying time surface,min
|
≤*0
|
Hard drying time, h
|
≤*4
|
Viscosity(paint 4cups), S
|
*0
|
Flexibility, mm
|
1
|
Impact strength, kg/cm2
|
*0
|
Adhesion, level
|
2
|
Salt water resistance *0days
|
No rust
|
Coating area thickness *0um m2/kg
|
4
6
|
Interval of the painting, *5℃,h
|
8
|
Construction reference:
1. Metal treatment: The rust on the surface of
the steel should be removed after sand blasting or shot peening. It
should reach the SIS SA2.5 level. There should be no sand, iron
shot or footprint on the surface of the steel.
2. Printing: Spraying, brush Painting and
roller coating are all allowed. Spraying is prefered. It is no need
diluting when brushpainting. When spraying the dilunet of 5 *0%
should be added to paint. The viscosity is decided by the user. The
thickness of the dry film should be *5um. When using with
chlorinated rubber, it is better to paint 2 layers. The thickness
of each layer is between *0 *0um.
3. proportion: This paint consist of 2
cans.(composition1:composition2=*0 :1),The proportion should be
strictly obeyed. The paint can be used in half an hour after
stiring in the temperature of *0 *5℃. In order
to avoid the precipitation of zinc powder the paint should be
stirred during the construction.
4. Attention: The using time of the paint is 8
hours. After 8 hours the paint become thick untile it becomes blue.
The interval of the painting is at least 4 hours. Half a year is
prefered. Usually one layer is painted everyday.
5. Matching: This paint can be used with epoxy
asphalt paint, epoxy antirust paint, epoxy micaceous iron
intermediate coat paint, oxidation rubber paint and
chlorosulfonated polyethylene paint.