FOB Price
Obtener el precio más reciente0 ~ 1
|Minimum Order
Place of Origin:
jinzhou
Price for Minimum Order:
-
Minimum Order Quantity:
1 Piece
Packaging Detail:
negotiable
Delivery Time:
negotiable
Supplying Ability:
4 Piece per Day
Payment Type:
T/T, L/C, D/A, D/P, Money Gram, Other
Persona de contacto Ms. Hong
No 837, Jinzhou, Liaoning
XBY type online material carrier, be applicable to the works
departments assignments handling railway roadbed side deposited
each rail or concrete pillow and frog etc online material goods.
This equipment can be shipped to korah, the manual car, do not need
any power supply. Walk the road wheel nylon materials, auxiliary
chain and implement the insulation performance is good, does not
affect the track circuit. Have weight light, road fast, Bridges,
and tunnels under difficult location may at any time doesn't cut
limit, refuge safety etc.
Second, the working principle and basic structure
Working principle: rotating crank, power through the gear reduction, ratchet direction limit, transfer to drum, after roller and pulley drive rail hook close or unload rail.
Basic structure: 1, crank 2, ratchet up to 3, big load crank shaft, four small load crank shaft, 5 nylon wheel 6, auxiliary support hook 7, the implementation of the 8 and rail hook 9, sleeper sling, *0 frog sling
Three, the basic parameters
1, maximum tension: 2 t
2, operation force: *0 kg/single arm, *0 kg/arms
3, quality: *2 kg
Four, method of use
1, roping rail, as shown in figure 1 shows, homework will be two table or three station car carry on existing single strands of rail, all distance lay out, the auxiliary support hook 6 hanging in another rail, car and stable frame in the rail, upward lift ratchet up to 2, the crank 1 from crank shaft take down, pull out of rail hook 8, will rail hook stuck in the rail, put down the ratchet up to 2, clockwise rotating crank heard "luo" sound, is ratchet protection, avoid material return, lest hurt. Will rail pull to the desired location. Load hours with small load crank shaft 4 (speed), load is great in the large load crank shaft 3 (speed slow, energy). If you want to carry away, for rail crane to ideal height, insert the implementation to press, loosen the auxiliary support hook, and promote the implementation of the rail can carry away. After the destination fixed good body, raise ratchet up at the same time the winder handle counterclockwise, remove rail.
Figure 2
2, roping sleeper: roping sleeper, a transport every time a root. Before shipment will rail hook and unload, change hook, with sleeper sling and nut will sleeper screw twist to live, hook hook sleeper sling, other operation process as above.
3, roping frog heart: two table at the same time, the need before roping off rail hook, mount hook, will be two frog sling *0 respectively button in the frog with and frog toe third screw hole position, take four pillars m*-m*4 splice joint screw bolt respectively, with hook hook spreader bar, can pull up or hanging away.
4, draw group switch: first choose good position, will switch fixed good, apparent switch size, selection of unequal number car, fixed good body, use rail hook clamping switch on the rail, the winder handle can will switch to pull into the reserve space.
5, hanging ballast (should bring their own musical dross bucket)
6, fast under way: when there is an emergency situation, need fast road, the first put the crank from crank shaft from open, lift up the detent 2, the object rapid downward slide, wait for after static object, take the auxiliary rail hook, but carried off way.
Five, the matters needing attention
1, operations shall be according to the railway engineering safety rules "concerned regulation organization construction and safety protection.
2, lifting *5 m rail, must be two table or three table and homework, personnel are not allowed to stand in front of material.
3, must be frequently inspect the rope card fixed situation.
4, stay roping material distance is far, should according to the need extension wire rope; It is strictly prohibited to use overload.
5, in the rapid road or work, in the pull out before the ratchet to crank out of crank shaft, lest crank hurt.
6, lifting material push the reinforcement should be vertical up.
7, before the use should check ratchet and ratchet contact condition, ensure ratchet and ratchet as shown in figure 2 and direction.
8, found that detent and ratchet meshing abnormal should be replaced immediately detent or ratchet. Not replace former banned.
9, assignments pay attention to personal safety inspection protection and traffic safety.
Six, maintenance and maintenance
1, gear box, smooth shaft inside and rail hook shaft and other parts must be charging *0 # - *0 # machine oil, per shift oil once.
2, all bearing should be regular injection grease to keep
machine good working condition.