FOB Price
Obtener el precio más reciente1000 ~ 10000 / Set
|Minimum Order
Place of Origin:
Xinxiang of Henan
Price for Minimum Order:
Minimum Order Quantity:
1 Set
Packaging Detail:
wooden cartons for electric parts, plastic woven cloth for steel plates.
Delivery Time:
with 30 days
Supplying Ability:
5000 Set per Year
Payment Type:
T/T, L/C, Western Union
Persona de contacto Rita
Xinxiang, Henan
LH model electric hoist overhead cranehas such features as tight dimensions, low building headroom, light dead weight and light wheel load.
1. Working with CD or MD hoist
2.The Cap:5t
3.The Span:7.***5.5m
4.The lifting height:***0m
5.Working rank:A*-A5
6.Working temperture:**5°C-**0°C
7.Operating methods:on floor and in the driver's cabin
8.Working conditions:forbidden to the combustible,explosive or corrosive media
9.Widely used mechanic processing workshop,subsidiary workshop of metallurgicalmills,warehuosse,goods yard and power station
Wire rope of electric hoist crane 2 tons
In order to prevent the wire rope loose reduced intensity, lifting mechanism should avoid the sling group when working. Wire rope must be timely correct lubrication, lubrication of soaked in kerosene for cleaning old oil, the absolute prohibition with a wire brush or other sharp apparatus for cleaning the dirt on the net rope; also the absolute prohibition of the use of acidic or other strong corrosive lubricant. Steel wire rope can continue to safe use, should be based on the selection of the electric hoist instruction manual.
Spare parts about electric hoist crane 2 tons
Limit switch,corrosion resistance material: polyurethane
Over weight protection over current protection, over pressure protection ,strong steel plates.
Technical Data of electric hoist crane 2 tons
Fixed lifting weight |
t |
5 |
||||||||||
operation type |
|
From floor; Control in driver room |
||||||||||
Speed |
lift |
m/min |
8,8/0.8 |
|||||||||
handcart travel |
*0 |
|||||||||||
cart travel |
Floor |
*0 |
||||||||||
Driver Room |
*5 |
|||||||||||
Motor |
lift |
|
ZD****4/*3 |
|||||||||
handcart travel |
ZDY***4/1.5×2 |
|||||||||||
cart travel |
Floor |
ZDY***4/1.5×2 |
||||||||||
Driver Room |
ZDY***4/1.5×2 |
|||||||||||
Electric Hoist |
Type |
CD1,MD1 |
||||||||||
Lifting Height |
m |
9,*2,*8,*4,*0 |
||||||||||
Working System |
|
A5 JC=*5% |
||||||||||
Power Supply |
|
*-PhaseA.C.,*0Hz,**0v |
||||||||||
Steel Track |
kg/m |
****3 |
||||||||||
Span |
m |
7.5 |
*0.5 |
*3.5 |
*6.5 |
*9.5 |
*2.5 |
*5.5 |
*8.5 |
*1.5 |
Control methods of double beam bridge crane: