¿Aún no es miembro de TradeKey.com? Regístrese para conectarse con 9 millones de importadores y exportadores a nivel mundial. registro |
BOOK A CALL
Book Call On Your Favorite Time

By Signing Up. I agree to TradeKey.com Terms of Use, Privacy Policy, IPR and receive emails related to our services

Contact Us
Sell High quality sealed primer

Sell High quality sealed primer

1 ~ 5 / Liter

|

Minimum Order

Place of Origin:

Tianjin, China

Price for Minimum Order:

Minimum Order Quantity:

50 Liter

Packaging Detail:

paper case

Delivery Time:

7 days

Supplying Ability:

999999 Square Meter per Month

Payment Type:

T/T

Contactar ahora
Miembro Básico

Persona de contacto Ms. Chelsea

ziyuanlu, Tianjin, Other

Contactar ahora

Description


1. With completion of surface pretreatment, steel surface may be uneven, primer may fill such unevenness to form a smooth film to increase contact area of pipe with adhesive layer for a strong bonding force. 

2. After pretreatment of pipe, primer may be able to get rid of dust on the pipe surface.

3. The moisture of pipe surface will volatilize with AP primer, thus reducing possibility of corrosion.

 

Time interval from pretreatment to paining of primer shall be within 4 hours, and timer interval from primer painting to winding of tape shall be within 8 hours and the primer surface shall be dry and without dust (winding of tape on very windy or humid days is not suggested).

For use of AP primer, primer shall be mixed and stirred to be even in a container. If primer is thick, add some thinner to dilute. Make use of clean brush, roll and other mechanical methods to paint primer. The primer painted on pipe shall not have missed spots, no bubbles, blots or dripping, and even film is to be formed. Each liter of primer shall cover pipe area ****2 m2 with manual operation. With drying of primer, start winding of adhesive tape.

Item

Pipecoat AP Prime paint

Color

Black

Solid content

≥*5%

Viscosity (for 4 cups)

****0

Compatibility with tape

Special paint for Pipecoat corrosion prevention tape to add adhesiveness of tape

Surface drying time (min)

≤5

Storage mode

*5°C-**5°Csealed to be put in shadiness

Operation temp

*5°C-**0°C

Package

4L and *0L iron can is used for package


Send a direct inquiry to this supplier

A:

Ms. Chelsea < Tianjin Lida Technology Development Co., Ltd. >

quiero saber: