FOB Price
Obtener el precio más reciente( Negotiable )
|Minimum Order
Place of Origin:
China
Price for Minimum Order:
-
Minimum Order Quantity:
1 Piece
Packaging Detail:
no packaging
Delivery Time:
60 days
Supplying Ability:
-
Payment Type:
T/T, L/C, Other
Persona de contacto Mr. Amiko
jiyang lake crown plaza, zhangjiagang, Other
Roll forming machine
|
Top ridge
|
Rolling speed
|
****5m/min(not include cutting time)
|
Rolling thickness
|
0.4mm
|
Control system
|
PLC (Panasonic) as list in the note
|
Un coiler
|
2TON for each head
|
dimension
|
***0×**0×***0mm
|
The material width
|
**5mm
|
Effective width
|
**0mm
|
Roller stations
|
9 stations
|
Roller material
|
*5#forge steel, coated with chrome
|
Shaft diameter
|
Material is *5# forge steel
|
Maim motor power
|
4kw
|
Hydraulic station power
|
5.5kw
|
Hydraulic pressure
|
*2Mpa
|
Material of cutting
|
Cr*2Mov
|
Tolerance
|
**1.5mm
|
Electric source
|
**0V, *0HZ,3 phase
|
Way of drive
|
1 inch single chain
|
Color of the machine
|
Yellow and blue
|
Container need
|
1 x*0 feet
|