Before the order
product must matters needing attention 1, the
purchase, estimates the electric appliance aggregate capacity which
first you use, selects has the same capacity transformer,
guarantees when the instantaneous starting does not burn out the
transformer.
2, this transformer strictly according to national related modular
design production, when you use the multi-windings (multi-control
voltage) when transformer, the capacity should increase the
transformer capacity correspondingly according to the
ratio-voltage, in order to avoid burns out the transformer.
3, before the installment, should examine the data plate to arrange
in order each data carefully whether to meet your requirement,
after confirming unmistakably, only then installs the use.
4, after circular telegram work, the transformer core and the coil
will give off heat (temperature rise not to surpass *0℃) belong
to the normal phenomenon, if the temperature rise surpasses *0℃,
even belches smoke, should the dump switch, inspect the electric
appliance capacity which immediately you use.
5, in the transportation, should avoid colliding as far as
possible, is sure not to be affected with damp, when use, please
note maintains, guarantees the transformer service life.
6, according to the user request custom make special transformer
product, the product size will change or the basis user request
consultation determination correspondingly.
|