¿Aún no es miembro de TradeKey.com? Regístrese para conectarse con 9 millones de importadores y exportadores a nivel mundial. registro |
BOOK A CALL
Book Call On Your Favorite Time
Code
🗘

By Signing Up. I agree to TradeKey.com Terms of Use, Privacy Policy, IPR and receive emails related to our services

Contact Us
AAC Block Production Line

AAC Block Production Line

|

Minimum Order

Place of Origin:

INDIA

Price for Minimum Order:

-

Minimum Order Quantity:

-

Packaging Detail:

-

Delivery Time:

-

Supplying Ability:

-

Payment Type:

D/P, D/A, T/T

Contactar ahora
Miembro Básico

Persona de contacto Mr. Sharan

CHINTHAMANIPUDUR, Coimbatore, Tamil Nadu

Contactar ahora

Description

AAC Block Production Line  

Main-raw-materials of AAC (Autoclaved Aerated Concrete) block are sand(or fly ash ), calx made as a new walling material of building with a special process, its production engineering and technical equipment was developed .AAC block is light, moisturizer, heat insulation, easy to process, sufficient materials source, can make use of industrial waste, become more and more popular in the market


Production process :

  1. Raw material prepare, mainly deal with blocky lime and sand

  2. Blocky lime broken by the crusher

  3. Ball Crusher mills the small blocky lime into powder.

  4. Wet-milling the sand into slurry

  5. Batching the Raw materials

  6. After batching pour the raw materials to pour mixer to make slur

  7. After mixing, pour the slurry uniformly into the mould

  8. After per-curing for a suitable temperature and time, the block will get a suitable hardness, and prepared for cutting

  9. Tilting hoister turns over the mould *0°

  10. Tilting hoister separates the mould and block, and transport the block together with side board to the cutter cart

  11. Longitudinal and horizontal vertical cut the block

  12. Semi-finished product hoister carries the cut block and side board to the curing cart, Marshalling the blocks and waiting for autoclave

  13. Autoclave the block with suitable temperature and pressure

  14. Stack and pack the finished product

  15. Transportation after packed

  16. Side board return

  17. Side board combine the mould and oil

  18. Mould transport to the position, wait for next pouring.

    visit chiragindia.in

Send a direct inquiry to this supplier

A:

Mr. Sharan < CHIRAG INTERNATIONAL >

quiero saber: